Similar Projects
Breton Bay Brewery
New Construction - 3,360 SF
Conception
$500,000 to $1,000,000 CJ est. value
Leonardtown, MD 20650

Jefferson Technology Park - Lincoln West II
New Construction - 116,948 SF
Design
Frederick, MD

Wood Farm Mineral Extraction Facility
New Construction
Design
Denton, MD 21629

Hc Properties Phase 1 & 2
New Construction, Renovation - 94,412 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Baltimore, MD 21230

Hc Properties Phase 1 & 2
New Construction, Renovation - 94,412 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Baltimore, MD 21230

Disposition and Development of Carvel Hall
- 70,321 SF
Results
Crisfield, MD 21817

Protenergy
Renovation
Construction
Cambridge, MD 21613

Aphena Building 3
Renovation - 54,000 SF
Construction
Easton, MD 21601

Big Truck Wye Farm Brewery
New Construction - 9,652 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Queenstown, MD 21658

Oyster Hatchery
New Construction - 20,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Sherwood, MD 21665

Frederick Commerce Center, Lot 3
New Construction - 220,150 SF
Design
Frederick, MD

Plug Power - Hydrogen Fueling Facility
New Construction
Construction
Hagerstown, MD 21742

Planet Found Industrial Facility
New Construction
Pending Verification
$20,000,000 est. value
Princess Anne, MD 21853

Process Integration
New Construction - 20,000 SF
Pending Verification
Princess Anne, MD 21853

L3Harris Technologies Expansion
Renovation, Build-Out - 90,000 SF
Pending Verification
Hanover, MD 21076

Reported 02/26/2022 12:00 AM
Project Title

Superbox Depleted Uranium (Du) Containment Facility

Physical Address View project details and contacts
City, State (County) Aberdeen Proving Ground, MD   (Harford County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Inspection, Preventative Maintenance, Repair and Modification (henceforth referred to as “maintenance”) of the SUPERBOX test site to include its constituent systems and components. Price proposals shall include Firm Fixed Pricing for quarterly maintenance/ Painting and Time & Materials for emergency and routine repairs of the SUPERBOX test site to include its constituent systems and components. The period of performance will be 15 March 2022- 14 March 2025 for a total of (1) base year and (2) 12 month option.

Details

Manufacturing/Processing Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents