Similar Projects
US 71: Bridges Near St. Maurice
Demolition, New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Campti, LA 71411

US 71: Bridges Near St. Maurice
Demolition, New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Campti, LA 71411

LA 120: Sabine Parish Line
Infrastructure
Bidding
$15,000,000 CJ est. value
Robeline, LA 71469

LA 120: Sabine Parish Line
Infrastructure
Bidding
$15,000,000 CJ est. value
Robeline, LA 71469

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Resurfacing of Bermuda Road
Infrastructure
Post-Bid
Natchitoches, LA

LA 8, LA 115 and LA 126 AST
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

LA 119: Realign At Magnolia Plantation
Infrastructure
Design
$5,000,000 CJ est. value
Cloutierville, LA 71416

Sewer Line Replacement - Louisiana School of Math, Science and the Arts
Infrastructure
Bidding
$400,000 CJ est. value
Natchitoches, LA 71457

FY 2021-22 Phase 1 Street Rehabilitation
Infrastructure
Post-Bid
$750,000 to $1,500,000 est. value
Natchitoches, LA 71457

Resurfacing Sam Sibley Drive Northwestern State University
Infrastructure
Results
LA

LA 1: LA 1-x to LA 6
Infrastructure
Design
$2,500,000 CJ est. value
Natchitoches, LA 71457

Drainage Improvements Phase IV
Infrastructure
Bidding
$75,000 CJ est. value
Natchitoches, LA 71457

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

Last Updated 01/24/2023 12:36 AM
Project Title

LA 6 : Install U-Turn Lanes West Of I-49

Physical Address View project details and contacts
City, State (County) Natchitoches, LA 71457   (Natchitoches County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type Improvement Construct a Pair Of U-turn Lanes With Median Improvements Length 0.63 miles Parish : Natchitoches Estimated Cost Range $2,500,000 to $5,000,000 As of January 24, 2023, the project is in Design status. Anticipated letting date is December 13, 2023. LADOT - LA 6 : Install U-Turn Lanes West Of I-49 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents