Similar Projects
Slide Repair, Erosion Control, Pipe Work
Infrastructure
Conception
$1,061,000 CJ est. value
Fort Pierre, SD 57532

Slide Repair, Erosion Control, Pipe Work
Infrastructure
Conception
$1,061,000 CJ est. value
Fort Pierre, SD 57532

AC Surfacing of Shoulders
Infrastructure
Design
$2,877,000 CJ est. value
Fort Pierre, SD 57532

AC Surfacing of Shoulders
Infrastructure
Design
$2,877,000 CJ est. value
Fort Pierre, SD 57532

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Surface Treatment
Infrastructure
Results

Mill, AC Resurfacing, Full Depth Reclamation, Pipe Work
Infrastructure
Conception
$10,947,000 CJ est. value
Fort Pierre, SD 57532

2022 Fort Pierre Asphalt Surface Treatment
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Pierre, SD 57532

OSRWSS South Coreline Reservoir and Pump Station No. 1 Upgrades
Renovation, Infrastructure
Results
$5,470,000 CJ est. value
Fort Pierre, SD 57532

Water Storage Tank - City of Fort Pierre
New Construction, Infrastructure
Conception
$1,760,000 CJ est. value
Fort Pierre, SD 57532

2022 Fort Pierre Mill & Overlay
Infrastructure
Post-Bid
Fort Pierre, SD

RFP Construction Manager at Risk - Stanley County School District Multi-Purpose Building Project
New Construction, Infrastructure
Post-Bid
$350,000 CJ est. value
Fort Pierre, SD 57532

2023 Crack Sealing and Joint Sealing
Infrastructure
Post-Bid
$300,000 CJ est. value
Fort Pierre, SD 57532

Last Updated 04/06/2023 10:37 AM
Project Title

2023 Fort Pierre Asphalt Surface Treatment

Physical Address View project details and contacts
City, State (County) Fort Pierre, SD 57532   (Stanley County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Asphalt Surface Treatment applied to approximately 48,236 SY of Streets in the City of Fort Pierre. The Total is comprised of 45,706 SY of Single Application and 2,530 SY of Double Application. Three of the streets include Cul-De-Sacs.The successful bidder is to furnish and install approximately 81 tons of asphalt surface treatment oil and 610 tons of asphalt surface treatment aggregate. Bidder shall provide the CRS-2P Oil with SDDOT Type 1B aggregate. The City of Fort Pierre reserves the right to accept or reject any or all BIDS, to waive any informality in the BID received and to accept the BID that is to the advantage of, and in the best interest of the City of Fort Pierre. Each bid must contain a certified check, a Cashier's check or Draft, for five percent (5%) of the amount of the bid; such check to be certified or issued by either a State or National Bank and payable to the City of Fort Pierre or in lieu thereof a Bid Bond for Ten percent (10%) of the amount of this bid, such bond to be issued by a Surety authorized to do business in the State of South Dakota and payable to the City of Fort Pierre as a guarantee that such bidder will enter into a contract with said the City of Fort Pierre, thereof in accordance with the terms of such letting and bid in case such bidder is awarded the contract. The Certified Check or other guarantee, or bid bond of the successful bidder, will be returned to him forthwith upon the execution of the contract and surety hereafter provided for. The Contractor shall also provide proof of liability insurance and workman's compensation insurance. Bids shall be marked "2023 FORT PIERRE ASPHALT SURFACE TREATMENT" and sealed. The City of Fort Pierre requests one (1) Original Bid and one (1) copy. Bids may be mailed to the City of Fort Pierre, P.O. Box 700, Fort Pierre, South Dakota, 57532 or hand delivered to the Office of the Finance Officer, 08 East 2nd Ave., Fort Pierre, South Dakota 57532.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents