Similar Projects
Furnish and Install Walk-In Cooler and Freezer Units for Two Schools
Results
Westminster, MD 21157

MPCTC Heat Exchanger Bundle
Post-Bid
Sykesville, MD 21784

MPCTC Needlepoint Bipolar Ionization Units
Post-Bid
Sykesville, MD 21784

Springfield Hospital Center Exhaust Hood Cleaning
Term Contract
Results
Sykesville, MD 21784

Air Handler Units Remove and Replace
Results
$100,000 to $500,000 est. value
Westminster, MD 21157

Repair of Cooling Towers at Winters Mill High School
Results
Westminster, MD 21157

Repair of Two Cooling Towers at North Carroll Middle School
Results
Hampstead, MD 21074

Heat Pumps for North Carroll Library
Results
Hampstead, MD 21074

HVAC and Mechanical Equipment Preventative Maintenance and Repair Westminster Readiness Center
Term Contract
Results
Less than $50,000 est. value
Westminster, MD 21157

HVAC and Mechanical Equipment Preventative Maintenance and Repair Laurel Readiness Center and FMS
Term Contract
Results
Less than $50,000 est. value
Laurel, MD 20708

HVAC Replacement Project at Spring Garden Elementary School
Results
Hampstead, MD 21074

HVAC Evaluation and Replacement for 91 West Main Street
Results
Less than $164,560 est. value
Westminster, MD 21158

HVAC Maintenance and Service for SHA in Westminster and Satellite Locations
Post-Bid
Less than $50,000 est. value
Westminster, MD 21157

MPCTC Needlepoint Bipolar Ionization Units
Post-Bid
Sykesville, MD 21784

Maintenance - Drivers Training Facility (DTF) Ceiling Mounted Heaters
Post-Bid
Less than $50,000 est. value
Eldersburg, MD 21784

Last Updated 03/26/2021 11:42 AM
Project Title

Winfield Elementary School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Westminster, MD 21157   (Carroll County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. RTU’s and VRF units Install Rooftop Units, consisting of ACCU’s and DOAS units. Install VRF ceiling cassettes. New DOAS units to include energy recovery wheels. Provide acoustical curbs for rooftop equipment Replace kitchen hood MAU. 2. Cooling plant – Remove in entirety 3. Heating plant – Remove in entirety 4. Underground fuel oil tank Drain and remove existing 7,900 gallon underground fuel oil tank. 5. ATC All controls to be done by Johnson Controls (as part of GC’s contract) Controls to be DDC 6. Hydronic piping – Remove in entirety 7. Classroom unit ventilators Remove existing unit ventilators and all associated piping, and controls 8. Ductwork and diffusers Remove or replace any ductwork as shown on drawings Replace all diffusers that remain 9. Baseboards Abandon baseboards and demo hydronic pipe to ceiling. 10. Exhaust Fans Replace all building exhaust fans. 11. Duration Plan for construction over 1 summer

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents