Description |
This is a multi-phase project. The first phase is anticipated to be a $1.5 million-dollar project consisting of the construction of a new bus loop on our Elementary School campus and the replacement of windows in our Elementary School building. The scope of this project has been finalized and the total duration for
the delivery of CM services is estimated to be approximately 12 months.
The second phase is estimated to be in the range of $20-26 million. This project includes, but is not limited to, improvement of infrastructure and building systems on a transportation facility, an Elementary School, and a Jr/Sr High School. The total project scope has not yet been finalized. The total
project duration for the delivery of CM services is estimated to be 36-44 months.
Bus Garage:
Phase 2: Bus garage will require either substantial renovation and expansion. Office reconfiguration,
accessibility improvements, wash bay construction, door replacement, slab and apron reconstruction,
recoating of foam roof, ventilation improvements, and electrical service and distribution.
Elementary School:
Phase 1: Window replacement and construction of new bus loop. Phase 2: Cafeteria renovation and
kitchen renovation, renovation of the kindergarten and UPK classrooms, window replacement, roof
replacement, PA and phone systems, interior lighting and site work, parking lot reconstruction and
playground replacement.
Jr/Sr High School:
Phase 2: Cafeteria and kitchen renovation, renovation of the 1963 classroom wing, window
replacement, masonry repointing, roof replacement, door hardware replacement, corridor floor tile
abatement, electrical distribution improvement, phone system, ventilation in older building wings,
extension of fire suppression system throughout, 1936 wing and parking lot reconstruction. |
Details |
Elementary School, New Construction, Middle/Senior High School, Renovation, Misc. Structures, Renovation.
Division 03 - | Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete. | Division 04 - | Masonry, Unit Masonry. | Division 05 - | Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications. | Division 06 - | Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork. | Division 07 - | Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection. | Division 08 - | Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents. | Division 09 - | Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting. | Division 10 - | Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Transportation Stop Shelters, Flagpoles. | Division 11 - | Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures. | Division 12 - | Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Pews and Benches, Benches. | Division 21 - | Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems. | Division 22 - | Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers. | Division 23 - | Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods. | Division 25 - | Integrated Automation. | Division 26 - | Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting. | Division 27 - | Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems. | Division 28 - | Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm. | Division 31 - | Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment. | Division 32 - | Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses. | Division 33 - | Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities. |
|