Similar Projects
Fire Station 5 Construction
New Construction, Infrastructure - 10,912 SF
Design
$3,000,000 CJ est. value
Sandy Springs, GA 30328

SR 11 Fm 0.16 Mi S of Woodlawn Dr / Bibb to 0.02 Mi S of SR 22
Infrastructure, Alteration
Design
$6,000,000 est. value
Macon, GA 31206

Northwest Harris Business Park Parcel A
Infrastructure
Bidding
$200,000 est. value
West Point, GA

Water System Improvements - Bembry Road Area
Infrastructure
Bidding
$200,000 CJ est. value
Unadilla, GA 31091

Prequalification Of Contractors for The Period 2021-2022
Post-Bid
Marietta, GA

St. Simons Elementary School Phase 1 Site Work
Post-Bid
Brunswick, Saint Simons Island, GA 31525

Duluth High School - Softball Stadium and Site Preparation
Results
Duluth, GA 30096

Force Main Replacement Phase 1
Results
Buford, GA 30518

Ariston Retail - Civil Package
New Construction, Infrastructure
Construction
Buford, GA 30519

Campground Road Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Dawsonville, GA 30534

Morningside Drive Duplex
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Marietta, GA 30060

LakePoint Hotel
New Construction, Infrastructure
Design
$39,000,000 CJ est. value
Emerson, GA 30137

Riverside Park Boat Ramp Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Evans, GA 30809

Potable Water Usage - Pointes West
Term Contract
Post-Bid
Appling, GA 30802

South Annexation - GEFA Phase III Infrastructure
Results
Richmond Hill, GA 31324

Last Updated 07/27/2022 12:57 AM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Walthourville, GA 31313   (Liberty County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor for the construction of: Division One: Approximately 6,100 linear feet of 6-inch water lines, complete with appurtenances. The work to be done consists of furnishing all material, equipment and labor. Division Two: Additions to the existing Well No. 3, install a forced draft degasifier, high service pumps, modify existing well pump, building modification all complete with appurtenances. Time allotted for construction is 240 consecutive calendar days for substantial completion and 270 days for final completion for Division One and is 240 consecutive calendar days for substantial completion and 270 days for final completion for Division Two. Proposals for the complete work in one or more general contract(s) shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. The project is proposed to be funded with ARPA funds. All ARPA special conditions requirements apply. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Walthourville, Georgia, in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Walthourville, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Walthourville, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Upon receipt of all documents in undamaged condition within 30 days after the date of opening of bids, half of the deposit will be refunded. The difference between the deposit and the amount refunded represents the cost of reproduction. No refund will be made for documents received after 30 days or in damaged condition. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents