Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build
Design
$18,000,000 to $20,000,000 est. value
Daytona Beach, FL

Lift Station No. 42 Replacement
Renovation
Bidding
Saint Petersburg, FL 33716

Bayshore Yacht Basin Relocation and Force Main Replacement
New Construction
Bidding
$3,092,000 est. value
Bradenton, FL 34207

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Master Lift Station X8
New Construction
Results
Immokalee, FL 34142

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Rehab of LS 54 and LS 65
Renovation
Construction
Clearwater, FL 33759

Electrical Upgrades for Lift Stations 118, 163, 174, 178, 233
Renovation
Bidding
$1,480,430 est. value
Orlando, FL 32824

Construction of Lift Station 1 Relocation
New Construction
Post-Bid
Maitland, FL

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

Lift Station S-19 Replacement
Renovation
Construction
$1,385,422 est. value
Melbourne Beach, FL 32951

Lift Station 12 Reconstruction
Infrastructure
Bidding
$990,000 est. value
New Smyrna Beach, FL 32168

Last Updated 04/18/2022 12:33 PM
Project Title

FY-2021 Blackwater Golf Club Lift Station and Force Main

Physical Address View project details and contacts
City, State (County) Crestview, FL 32536   (Okaloosa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide the City with a new wastewater lift station and force main at Blackwater Golf Club along with the required utility improvements associated with the revitalization of the Golf Club. The project generally includes miscellaneous site work, installation of a fiberglass wetwell and pumps furnished by the owner, installation of sanitary sewer force main and connection to an existing force main within the system, installation of a sanitary sewer gravity collection system, electrical work including site lighting and controls, and site restoration. The contractor shall provide and install the new lift station, force main, and utility improvements in accordance with the plans and specifications and shall include all materials and labor to provide a fully functioning and reliable wastewater conveyance system.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents