Similar Projects
Dam Safety Modification Additional Relief Wells and Collector System Upgrades, Mohawk Dam, Warsaw, Ohio
Design
Warsaw, OH 43844

Southerly Boiler Feedwater Pumps Procurement - Dominic
Infrastructure
Bidding
$200,000 est. value
Cleveland, OH

Atwood Raw Water Pump Building Project
Infrastructure
Bidding
$85,000 est. value
Mineral City, OH 44656

Additional Relief Wells and Collector System Upgrade
Post-Bid
Warsaw, OH

Refurbish Influent Pump No. 2
Post-Bid
Hamilton, OH 45011

Three (3) Progressive Cavity Sludge Pumps
Results
Springfield, OH 45502

Pub Well Field Control Tower (Wells 17-20)
Results
Less than $347,432 est. value
Batavia, OH 45103

DOW/PAWP-Watson Marlow Pump Upgrade
Infrastructure
Bidding
Columbus, OH

Pump Motor Replacement
Post-Bid
New Boston, OH 45662

Penn Valley Pumps and Pump Parts UTC
Results
Columbus, OH

Submersible Vertical Well Pump
Post-Bid
Dayton, OH

DM-2 Pump Replacement
Results
Less than $365,000 est. value
Dayton, OH

Panel Assemblies for KI Miami North Wells
Post-Bid
Dayton, OH

Trash Pump
Results

Drilling (4) Monitoring Wells, Ohio, USA
Post-Bid
$25,000 to $100,000 est. value
Columbus, OH

Reported 06/16/2021 12:00 AM
Project Title

Influent Screw Pump Installation

Physical Address View project details and contacts
City, State (County) Chillicothe, OH   (Ross County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the following Work: Installation of one new influent screw pump and slide gate. Procured equipment supplied by EPIC International, Inc. will be assigned to this Contract for installation by CONTRACTOR to provide a fully functional influent screw pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents