Similar Projects
Ontario County Jail HALT Act Renovations
Renovation
Sub-Bidding
$400,000 CJ est. value
Canandaigua, NY 14424

Blinds
Alteration
Post-Bid
NY

Bathtub Wall Surrounds & Ancillary Work
Term Contract
Post-Bid
$50,000 to $999,000 est. value
New York, NY 10065

Provide Security Ceilings, Buildings 4, 6, 7, and 8 at Elmira PC
Alteration
Results
$100,000 to $2,000,000 est. value
Elmira, NY 14901

Raquette Lake UFSD - Existing Wall Repair and Door Replacement
Alteration
Results
$105,000 est. value
Raquette Lake, NY 13436

Reconstruction of Primary Tanks, Wards Island Waste Water Treatment Plant
Renovation
Construction
$123,296,000 CJ est. value
New York, NY 10035

Jamestown Public Schools Capital Project Phase 1 at Fletcher Elementary, Technical Academy and Bus Garage - BP-02 General Trades
Renovation
Construction
$11,000,000 CJ est. value
Jamestown, NY 14701

High School Finishes Project
Alteration
Post-Bid
Fairport, NY 14450

Design for Kitchen Renovation at Pierce IRA
Infrastructure
Results
Less than $50,000 est. value
Webster, NY 14580

Geneseo CSD 2021 Capital Outlay Project
Alteration
Post-Bid
Geneseo, NY 14454

Design for Bathroom Renovation at Larkspur IRA
Infrastructure
Results
Less than $50,000 est. value
Rochester, NY 14622

Administration Building Alterations for the Joint Regional Sewerage Board
Alteration
Post-Bid
Haverstraw, NY 10927

Design for Bathroom Renovation at Middle Road IRA
Infrastructure
Results
Less than $50,000 est. value
Rush, NY 14543

Restroom Stalls and Urinal Screens
Alteration
Post-Bid
Rochester, NY

Hultquist Library Finishes and Lighting Replacement at Jamestown CC
Alteration
Results
$75,000 to $160,000 est. value
Jamestown, NY 14701

Last Updated 05/23/2023 07:06 AM
Project Title

Gutter Repairs and Replacement - B100

Physical Address View project details and contacts
City, State (County) Newburgh, NY 12550   (Orange County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Background The 105th Airlift Wing Civil Engineer Squadron is looking to replace the gutter system on the roof of building 100 (North and South side of Hangar). The current system has been identified to W50S8D23R0006 Page 4 of 20 be the cause of leaks within the building. 2. Scope Contractor will furnish all engineering, supervision, tools, parts, material, labor, supplies, permits, equipment and incidentals required to properly perform work outlined below. All work will be performed in a safe manner and will be accomplished in accordance with all local, state, federal, and safety regulations to include any hazardous waste disposal if necessary. All materials to be installed must be submitted and approved prior to installation. 3. Objectives Contractor will remove/discard existing gutters liner at building 100 and shall furnish and install comparable gutter system. This scope of work, at a minimum, will include the below: A. Building 100 North/South (Hangar) 1. Contractor will remove all debris and existing rubber gutter liners from all gutters to be coated, lined, and prepped as required. 2. All debris will be discarded properly and safely. 3. Contractor will furnish and install a "GAF TOPCOAT(R)" metal roof restoration-silver system in the gutters along drainage grating with appropriate hardware within the area of work. 4. Gutter's dimensions are measured to be approximately: a. 630 Linear ft b. 12inx18inx12in 5. Gutter Drain 6in. drain (27 Total) will be replaced along with elbow where it meets exterior gutter at penetration. (See Attachment 6) In accordance with industry standards. B. Any work debris generated from demolitions or work scraps or any item listed above are to be discarded and removed appropriately by the contractor from the base. C. The Contracting Officer/Representative will be the final approving authority upon completion of work with regards to quality, safety, and cleanliness. D. Work schedule must be submitted at least 15 days prior to start.Work performed in a restricted work area must be coordinated with the COR daily. Any deviations from schedule may results is delays, issues, and/or stoppage of work. E. The worksite shall be cleaned on a daily basis and any foreign object and debris (FOD) hazards shall be removed throughout the period of performance. 4.Delivery All parts and materials will be new parts and materials, as manufactured or recommended by the manufacturer. Performance will take place at the 105th Airlift Wing, Stewart ANGB, Newburgh, W50S8D23R0006 Page 5 of 20 NY. The Performance Period will be 21 days. 5.Pre-Construction Meeting The Contractor will be required to meet with the Contracting Office, BCE representative and other members as required prior to the commencement of any work in order to coordinate the project schedule and requirements to work on a military installation. Topics of discussion will include: Hours of work, lay-down and storage areas, work area limits, safety compliance, emergency notifications and any other topics deemed necessary by the Contracting Officer or Contracting Officer representative. 6. Government Furnished Property: None. 7. Security Contractors should be aware that this is a Military Installation and that all access to this installation is granted by the 105 AW Base Defense Squadron. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the 105th AW Base Defense Squadron. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer. A contractor's badge will be issued once The Contractor enters the main gate at Stewart Air National Guard Base. All employees are required to have the proper ID (social security card, driver's license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away. Vendors should be aware that Anti- Terrorism Force Protection Measures are applicable to this contract. Vendors will be briefed on these measures by Base Defense personnel if recurring or long term access is required to Stewart ANG Base. Otherwise you will be escorted at all times by a member of Stewart ANG Base. Site Visit is scheduled for Tuesday April 25th @ 1pm for all of those who are interested. If you plan on attending the site visit, you MUST let kevin.fenner.1@us.af.mil know ahead of time AND ALL individuals MUST bring two (2) forms of government ID (Drivers License, SS card, Passport, etc.). ***You will NOT be allowed access to the base without the two forms of ID*** We will NOT entertain a second site visit. No questions about project details will be answered after 4:00pm Wednesday May 3rd.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents