Similar Projects
David Prouty High School
Renovation, Addition
Conception
$30,000,000 to $50,000,000 est. value
Spencer, MA 01562

Dr. Albert B. Consentino Middle School
Renovation, Addition
Conception
Haverhill, MA 01832

Westport Middle School - Town of Westport
Addition, New Construction, Renovation, Infrastructure
Design
$7,500,000 CJ est. value
Westport, MA 02790

New Doherty Memorial High School - Concrete / Steel Package
Addition, Demolition, New Construction, Renovation, Infrastructure - 421,858 SF
Design
$240,000,000 CJ est. value
Worcester, MA 01602

RFQ Construction Manager at Risk - Whittier Regional Vocational Technical High School
New Construction, Infrastructure
Bidding
$346,000,000 CJ est. value
Haverhill, MA 01830

Benjamin Brown Schoolyard Improvements and Surface Reconstruction
Infrastructure
Bidding
$742,000 CJ est. value
Somerville, MA 02144

New Middle School Project - Coakley Middle School - Filed Sub
New Construction, Infrastructure - 187,840 SF
Sub-Bidding
$119,500,000 CJ est. value
Norwood, MA 02062

Josiah Quincy Upper School Swing Space Project - Filed Sub Bids
Post-Bid
$1,044,030 est. value
Boston, MA

Sale and Development of the Former Rogers Elementary School
Post-Bid
Fairhaven, MA 02719

Underground Waterproofing - Doherty Memorial High School
New Construction - 421,858 SF
Results
$238,000,000 est. value
Worcester, MA 01602

Construction Management at Risk Services - Stoneham High School
Results
Less than $140,000,000 est. value
Stoneham, MA 02180

Renovations to the Learning First Charter Public School
Renovation
Construction
$15,705,908 est. value
Worcester, MA 01605

Athletic Facility Improvements - Cape Cod Regional Technical High School - General Bid
New Construction - 1,465 SF
Construction
$3,300,000 est. value
Harwich, MA 02645

Derby Academy Expansion
Addition
Pending Verification
$93,500 est. value
Hingham, MA 02043

Boston College High School - Phase 1
New Construction, Renovation
Pending Verification
$100,000,000 est. value
Boston, MA 02125

Last Updated 03/09/2023 04:13 PM
Project Title

Flooring Installation / Re-finishing of HVAC-R Technical Department

Physical Address View project details and contacts
City, State (County) Palmer, MA 01069   (Hampden County)
Category(s) Education
Sub-Category(s) Middle/Senior High School, Vocational School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $24,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Flooring. Flooring installation / painting for 3500 square feet including but not limited to: Mechanically grinding floor to prepare for installation of new coating; Repairing any cracks and pitted areas. Applying a pigmented base coat. Flaking the pigmented base coat to rejection. Scraping and vacuuming the flake coat to prepare for top coat application. Applying a clear polyaspartic top coat at 12 mils. Site clean up at the end of each day and final Inspection on completion. Base coat 1150 FC epoxy MDB. Top coat 85% polyaspartic. High wear urethane top coat for slip and scratch resistance All work must be performed and completed between April 23, 2023 and May 6, 2023 unless otherwise agreed upon with the Pathfinder School District. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents