Similar Projects
Whispering Pines
New Construction, Infrastructure
Conception
$60,000,000 CJ est. value
Canton, GA 30115

Univeter Road Mixed-Use Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Canton, GA 30115

Holly Springs City Hall
New Construction, Infrastructure - 16,000 SF
Design
$6,000,000 CJ est. value
Holly Springs, GA 30115

Kennesaw Storage Facility
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Acworth, GA 30102

RFP Design - 2 New Northeast Cherokee Parks
Infrastructure
Bidding
$1,800,000 CJ est. value
Ball Ground, GA 30107

RFP Design - 2 New Northeast Cherokee Parks
Infrastructure
Bidding
$1,800,000 CJ est. value
Ball Ground, GA 30107

Walking Trails At Cherokee 75 Corporate Park
Infrastructure
Post-Bid
$2,000,000 est. value
Acworth, GA 30102

2022 LMIG and SPLOST Street Repairs
Infrastructure
Post-Bid
$600,000 CJ est. value
Canton, GA 30114

Streetscapes III Sidewalk Phase
Results
Woodstock, GA

Main Street at Linton Drainage Improvements
Infrastructure
Results
Woodstock, GA

Hickory Flat Library Renovation and Additions - Rebid
Addition, Demolition, New Construction, Renovation, Infrastructure - 10,390 SF
Construction
$5,200,000 CJ est. value
Canton, GA 30115

212 Ridge Rd Medical Office Building / Aylo Family Medicine
New Construction, Infrastructure - 13,476 SF
Construction
$3,200,000 CJ est. value
Canton, GA 30114

Prominence Point Parkway Apartment Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Canton, GA 30114

Woodstock City Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$40,000,000 CJ est. value
Woodstock, GA 30188

Rope Mill Lane Climate-Controlled Self-Storage Facility
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Woodstock, GA 30188

Last Updated 04/06/2023 12:07 PM
Project Title

Precast Parking Deck Project

Physical Address View project details and contacts
City, State (County) Holly Springs, GA 30115   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,217,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Precast Parking Deck Construction component of the Holly Springs Mixed-Use Site Work and Infrastructure Project. All engineering and technical questions should be directed to Jason Manners at jason.manners@kimleyhorn.com. The time allowed for Substantial Completion is 18 consecutive months from the date specified in the Notice to Proceed. Nonrefundable liquidated damages in the amount of $500 per calendar day (except Sundays and federal holidays) will be deducted from monies due the Contractor in the event that a portion of the work remains incomplete beyond the agreed upon contract completion date. The official Notice to Proceed is anticipated to be given to the chosen contractor in the spring of 2023. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNERS in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract. The Successful Bidder will be required to furnish a performance bond for one hundred percent (100%) of the awarded project bid amount and a payment bond for one hundred percent (100%) of the awarded project bid amount, with the executed Contract meeting the requirements of the Instructions for Bidders. The terms and time for payment are set forth in the Contract. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Requests for payments are due by the Fifth (5th) of the month for payment by the Twentieth (20th) of the month less 5% retainage. Retainage will be held until final acceptance of the project by the City of Holly Springs. All Bids will remain subject to acceptance for 90 days after the date of the Bid opening, but the OWNERS may, in their sole discretion, release any Bid and return the Bid security prior to that date. The Owners reserve the right to reject any or all Bids, to waive formalities and re-advertise.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents