Similar Projects
Clintonville Public School District - Bid Package #2
Renovation, Addition
Bidding
Clintonville, WI

Marshall Early Learning Center
Renovation
Bidding
Marshall, WI 53559

Parkside Elementary School Bid Package 1
Renovation, Addition
Post-Bid
Fond du Lac, WI 54935

Parkside Elementary School Bid #2
Renovation, Addition
Post-Bid
Fond du Lac, WI 54935

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Stateline Boys and Girls Club
New Construction, Renovation - 22,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

Saint Augustine Preparatory Academy Expansion
Addition - 11,000 SF
Pending Verification
Milwaukee, WI 53207

Roberts Elementary School Interior Remodeling and Renovations
Renovation
Post-Bid
Fond du Lac, WI 54935

Hamilton Elementary
Renovation, Addition - 18,000 SF
Results
La Crosse, WI 54601

Evans Elementary School Interior Remodeling and Renovations
Renovation
Post-Bid
Fond du Lac, WI 54935

2021 Elementary School Renovation
Renovation
Results
New Holstein, WI 53061

Hatley Elementary School Renovation
Renovation
Post-Bid
Hatley, WI 54440

Milwaukee Parkside School Of The Arts - Energy Conservation Building System Upgrades
Renovation
Results
Milwaukee, WI 53207

Hawthorne Elementary School
Addition - 2,449 SF
Post-Bid
Waukesha, WI 53188

Last Updated 07/21/2021 03:45 PM
Project Title

Cormier School and Early Learning Center and Pioneer School Office and Entrance

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54304   (Brown County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Cormier School project generally consists of: 1. Installation of an approximately 1,400 square foot building addition at the north end of the school that will serve as a new entrance and restrooms. 2. Demolition of an existing canopy and installation of an approximately 1,950 square foot building addition near the main entrance to serve as the new school office, health room, and increase the size of the library. 3 . Approximately 3 , 900 square feet of interior alterations to two existing classrooms, the former school office, and the former teacher lounge/workroom. 4. Installation of a new paved parent drop off loop north of the existing parking lot. 5. Modifications to South Broadway Street to install an additional lane for school bus staging 6. Demolition of the existing playground equipment and preparation of the new playground area (Note: the new playground equipment and wood chips will be installed by others under separate contract with the owner). M. The Pioneer School project generally consists of: 1. Installation of an approximately approximately 2,230 square foot building addition at the southwest corner of the school that will serve as a new office, entrance, and health room. 2 . Approximately 3 ,150 square feet of interior alterations to an existing classroom, the former school office, and the formerteacherlounge / work room . 3. Installation of a new paved parent drop off loop north of the existing parking lot. 4. Modifications to the existing parking lot and replacement of the sidewalk. 5. Replacement of an existing underground water pipe from the north east corner of the building to the main at Pioneer Drive. 6. Replacement of a concrete curb near the existing bus drop off lane

Details

,, 11,230 SF - Middle/Senior High School, Approximately 1,950 SF Addition, Middle/Senior High School, Approximately 3,900 SF Renovation, Middle/Senior High School, Approximately 2,230 SF Addition, Middle/Senior High School, Approximately 3,150 SF Renovation.
Division 01 - General Requirements, Temporary Construction.
Division 02 - Existing Conditions, Common Work Results for Existing Conditions, Geotechnical Investigations, Demolition, Selective Site Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Steel Framing, Steel Joist Framing, Steel Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Pedestrian Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents