Similar Projects
Denton AO - Parking Lot
Bidding
Denton, TX 76208

2021 Sidewalk Improvements Project
Infrastructure
Bidding
$80,000 to $95,000 est. value
Highland Village, TX 75077

Aquatic Center Parking Addition
Post-Bid
Little Elm, TX 75068

Lewisville Valley Ridge Trail
Post-Bid
$1,800,000 est. value
Lewisville, TX

Concrete Walkway Project
Results
$25,000 to $100,000 est. value
Denton, TX 76209

Downtown Justin Shared Parking Improvements
Results
$1,054,037 est. value
Justin, TX 76247

Concrete Road and Sidewalk Repair in the Lantana Project
Infrastructure
Bidding
TX

2021 Automated Gated Secure Parking Area
Post-Bid
Hickory Creek, TX 75065

Police Department Parking and Sidewalk Improvements
Results
Aubrey, TX 76227

IH 35 - Construct Ramps
Infrastructure
Bidding
$1,834,419 est. value
TX

Cascades/Grandscape Trail
Results
$1,346,484 est. value
The Colony, TX 75056

Concrete Road and Sidewalk Repair in the Lantana Project
Results
Bartonville, TX 76226

Blue Ridge Trail Reconstruction
Results
$763,700 est. value
Flower Mound, TX 75028

Repair of Bus O and M Parking Lot Around Oil Separator Concrete
Results
Lewisville, TX 75067

Hound Mound Parking Lot and Restroom Project
Results
Flower Mound, TX 75028

Last Updated 06/10/2021 12:09 PM
Project Title

FY 2021 Capital Outlay Project

Physical Address View project details and contacts
City, State (County) Hickory Creek, TX   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $321,268
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair of approximately 1,395 square yards of concrete pavement, 362 square yards of concrete sidewalk, 308 linear feet of concrete curb and gutter repair at various locations throughout the Town as well as pavement markings at Point Vista Road, Ronald Reagan Avenue, and Turbeville Road. The scope of work associated with the project includes concrete pavement, sidewalks, curb and gutter, and pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents