Similar Projects
HVAC System Startup and Preventative Maintenance 2021-2023
Term Contract
Post-Bid
Elmhurst, IL 60126

2021 HVAC Roof Top Replacement at Fairmont School
Post-Bid
Lockport, IL 60441

Addison Trail High School Main Gym RTU Replacement
Results
Addison, IL 60101

Update HVAC Controls - Heating
Results
Less than $2,000,000 est. value
Springfield, IL 62702

Exhaust/Make-Up Air System
Post-Bid
Sauget, IL 62201

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Boiler and Hot Water Heater Maintenance
Term Contract
Post-Bid
Lisle, IL

Des Plaines HVAC Improvements
Results
Des Plaines, IL

Hail Damaged HVAC Equipment Replacement
Infrastructure
Post-Bid
Urbana, IL 61802

Morton College Building E - HVAC
Renovation
Results
Less than $100,000 est. value
Cicero, IL 60804

Grade School HVAC
Alteration
Post-Bid
Milford, IL 60953

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

HVAC Air Mitigation
Alteration
Post-Bid
Wauconda, IL 60084

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

Emergency Contract for HVAC Services
Term Contract, Alteration
Post-Bid
IL

Last Updated 01/26/2023 10:31 PM
Project Title

HVAC Upgrades at Monroe Elementary School

Physical Address View project details and contacts
City, State (County) Casey, IL 62420   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $612,500 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall include the removal of existing steam and condensate piping, finned tube assemblies and installation of a new vertical unit ventilators, new condenser units, new hot water distribution piping and pumps, new BAS controls and an alternate bid new hot water boiler along with other miscellaneous associated work including electrical work at Monroe Elementary School located in Casey, Illinois. All work shall be bid under one prime contract. All bidders shall submit and enclose with their bid signed certifications that the contractor is not barred from bidding on the contract as a result of a violation of either Section 33E-3 or 33E-4 of Article 33E, Public Act 85-1295 (Senate Bill 2002) effective January 1, 1989. Certification must be submitted on the form furnished in the Project Manual. Each bid shall be accompanied by a bid deposit in the form of a certified check or bid bond in the amount of 5% of the base bid, payable to the Casey-Westfield Community Unit School District No. C-4, Casey, Illinois. A Performance Bond and Payment Bond will be required of the bidder(s) to whom a contract is awarded. If any person contemplating submitting a bid for proposed contract is in doubt as to the true meaning of any part of the plans, specifications, or other proposed contract documents, he may submit to the A/E a written request for the interpretation thereof. The Contractor shall not submit a request after 72 hours before bid opening. Any interpretation of the proposed documents will be made only by Addendum duly issued and a copy of such Addendum will be conveyed electronically (emailed or faxed) to each person receiving a set of documents. The A/E will not be responsible for any other explanation of interpretation of the proposed documents. All Prime Contractors requesting Bid Documents sent to them, will be shipped via UPS Ground and the contractor shall remit a separate check (non-refundable) made payable to the A/E in the amount of $25.00 per set for shipping and handling. Material suppliers may purchase copies of the drawings and specifications at a cost of $7.00 per sheet of drawings and 40c per page of specifications, non-refundable. Contractors submitting proposals shall complete them in accordance with schedule in Instructions to Bidders. When the word Owner occurs in the Contract Documents, it shall apply to the Board of Education, Casey-Westfield Community Unit School District No. C-4, Casey, Illinois, or its authorized representative. When the word Contractor occurs, it shall apply to any firm or individual having a direct contract with the Owner. When the word Subcontractor occurs, it shall apply to any firm or individual having a direct contract with the Contractor. All bidders are advised that the law concerning prevailing wage rates shall comply with all requirements of the Illinois Prevailing Wage Act. The latest published prevailing wage rates have been included within the Project Manual along with stipulations on updates by the Office of the State of Illinois, Department of Labor, telephone 217/782-6206. No bid may be withdrawn for 60 days after date of opening of bids and the Owner reserves the right to waive any and all informality on bidding and the right to reject any or all bids or any part thereof and to accept the bid or bids being most favorable to the Owner after all bids have been examined and evaluated. The Owner's waiver of any breach or failure to enforce any of the terms and conditions of the Advertisement for Bids or Instructions to Bidders, shall not in any way affect, limit, or waive the Owner's right thereafter to enforce and compel strict compliance with every term and condition thereof.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents