Similar Projects
Roofing, Roof Accessories and Roofing Design
Alteration
Design
$500,000 to $2,000,000 est. value
Robins Air Force Base, GA

Contractor - Warm Springs National Fish Hatchery Partial Roof Replacement
Alteration
Design
$300,000 est. value
Warm Springs, GA 31830

Roof Replacement At Jail, Fleet Mgmt And Health Dept
Alteration
Bidding
$1,668,840 est. value
Athens, GA 30605

Uwanee Police Station Re-roofing
Alteration
Bidding
$200,000 est. value
Suwanee, GA 30024

Metal Roof for Clay Street Barn
Post-Bid
Attapulgus, GA 39815

Metropolitan Transportation Center - Roof Replacements
Post-Bid
Atlanta, GA 30310

5-H Roof Replacement 2 Phases (12) (13) Unites
Results
Less than $131,986 est. value
Montezuma, GA 31063

Design-Build Infrastructure - Roof Replacement
Results
Less than $11,000,000 est. value
Atlanta, GA 30313

Cozy Ellison Building Roof Replacement
Alteration
Bidding
$700,000 est. value
Fort Valley, GA 31030

Design Services for Roof Replacement
Post-Bid
Reidsville, GA

Airport Terminal Roof Replacement
Results
Statesboro, GA 30461

Blythe Elementary School Roofing Replacement
Alteration
Bidding
$200,000 est. value
Blythe, GA 30805

Speculative Building Roof System
Post-Bid
Hazlehurst, GA 31539

Recreation Pool Building Roof Replacement
Results
Thomaston, GA

Byron Elementary Re-Roof
Alteration
Bidding
$600,000 est. value
Byron, GA 31008

Last Updated 06/27/2022 06:11 AM
Project Title

Fire Station 7 Roof Replacement

Physical Address View project details and contacts
City, State (County) GA 30622   (Oconee County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all labor, materials, and equipment required to complete the following: 1. All set up, hoisting, and clean up. 2. Removal and disposal of existing roof system, down to the purlins. 3. Installation of new steel metal roof system with all required flashings and trim. 4. Installation of new steel gutters and downspouts as currently installed on the building. 5. Removal and disposal of existing insulation below metal roof. 6. Installation of new insulation. ­ Insulation shall be provided with adequate support to prevent future sagging. ­ Insulation shall be presentable in appearance as it will be exposed and visible from the bay area.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents