Similar Projects
Carkeek CSO Dechlorination System Replacement
Alteration
Design
$860,000 est. value
WA

BRPS Fish Counting Systems
Alteration
Design
$750,000 est. value
WA

CDJ Powerhouse Fall Protection
Term Contract
Bidding
$100,000 to $250,000 est. value
Bridgeport, WA

Inductive Charging Infrastructure for Everett Transit
Alteration
Bidding
$250,000 est. value
Everett, WA 98201

Heavy Wall Meter Boxes and Meter Box Lids
Alteration
Post-Bid
Bellingham, WA 98229

Foreign Object Debris (FOD) Mats
Term Contract, Alteration
Post-Bid
Everett, WA 98201

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Brps Fish Counting Systems
Term Contract
Design
$750,000 est. value
WA

Hydraulic Systems Maintenance and Repair
Term Contract
Bidding
Seattle, WA 98134

Ductile Iron Pipe, Fittings, Couplings, Pipe Restraints and Grip Rings
Term Contract, Alteration
Post-Bid
Bellingham, WA 98229

Marine Cell Fender Procurement Berth 17
Infrastructure
Results
$176,250 to $194,785 est. value
Vancouver, WA 98687

Solid Waste Transfer Station Scale Replacement Project
Alteration
Bidding
Pullman, WA 99163

Snow Removal Equipment
Infrastructure
Post-Bid
WA

Gorbel 1-Ton Gantry Crane "Off-The-Shelf" Or An Approved Or-Equal
Alteration
Results
Less than $8,000 est. value
Spokane, WA

Last Updated 03/18/2022 11:08 AM
Project Title

Salmon Creek Treatment Plant Equipment and Materials for the Phase 5B Package 2 Secondary Treatment Process Improvements Project

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98685   (Clark County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $758,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project contemplated consists of: 120-foot diameter secondary clarifier mechanism, suction duct type. Two (2) 100 hp, 12-inch return activated sludge pumps. Motor Control Center (MCC) and Adjustable Frequency Drives (AFDs). Process Piping Materials: Cement-lined ductile iron, and welded steel piping (8-inch, 18-inch, and 36-inch diameter). Process Valves: Plug valves (8-inch through 24-inch); swing check valves (16-inch).

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents