Similar Projects
River Bottom Improvement Project Prequalification
Post-Bid

Culinary Water Improvement Project on 300 West Street and 1600 North Street
Post-Bid
$250,920 est. value
Sunset, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

37th Street Reconstruction Project and Culinary Waterline Replacement CDBG Project
Results
South Weber, UT 84403

Culinary Water Line Replacements
Post-Bid
$250,000 est. value
Bountiful, UT

1200 South Waterline Project
Results
$150,000 to $200,000 est. value
Syracuse, UT

East Chase Lane To Parrish Lane - Culinary Waterline and Storm Drain
Post-Bid
$450,000 est. value
Centerville, UT 84014

Milford City Water Improvement Project
Results
Less than $5,000,000 est. value

1500 South Waterline
Infrastructure
Post-Bid
Woods Cross, UT

Parks and Open Spaces Master Valves and Flow Meters
Results
Clearfield, UT 84015

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Porter Rockwell Boulevard Segments 4 & 5 Water Line and Street Lighting
Results
Less than $1,419,075 est. value

Lacey Way Waterline and Street Reconstruction
Infrastructure
Post-Bid
North Salt Lake, UT 84054

200 East and Main Street Water Project
Results
Farmington, UT

600/640 West Street and Culinary Water Reconstruction Project
Infrastructure
Post-Bid
West Bountiful, UT

Last Updated 04/14/2022 10:42 PM
Project Title

2022 Waterline Projects

Physical Address View project details and contacts
City, State (County) Fruit Heights, UT   (Davis County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

he Project consists of replacing the existing asbestos cement (AC) water main with new C-900 PVC. This includes saw cutting the existing asphalt, laying the new water main, running new poly water services with tracer wire, removing existing meter boxes, supplying new yoke and meter box with lid, backfilling trenches, patching back the asphalt in the roadway, concrete replacement, and any landscape restoration. The AC water main will be capped and abandoned in place after the new main is brought into service. Bid will be received for possible multiple contracts. Bids shall be on a unit price basis, as indicated in the Bid Form.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents