Similar Projects
Boat Storage Facility
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Gloucester, MA

Little Beach Pier and Beach Maintenance Project
Conception
Falmouth, MA 02114

Tuck`s Point Public Dock Improvements
Infrastructure
Bidding
Manchester-By-The-Se, MA 01944

Replacement of Pier Fender System, Plymouth Breakwater Footbridge
Alteration
Bidding
$100,000 to $250,000 est. value
Plymouth, MA 02360

Middle Wharf Wale System Replaced
Post-Bid
Less than $60,000 est. value
Mattapoisett, MA 02739

Replacement of Winter Island Finger Floats
Post-Bid
Less than $40,000 est. value
Salem, MA 01970

Barlows Landing Dinghy Dock Improvement
Results
$260,000 est. value
Buzzards Bay, MA

Houghs Neck Boat Ramp Reconstruction Project
Results
Less than $750,000 est. value
Quincy, MA 02169

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Sycamore Grove Deck Project
Infrastructure
Bidding
$52,000 est. value
Backbay Beacon Hill, MA

Oak Bluffs Structural Pier Repairs 2020
Post-Bid
Less than $500,000 est. value
Falmouth, MA

Project Manager Services for Town Landing Beach/Park
Results
Less than $10,000 est. value
Pembroke, MA

Steel Sheet Pile Bulkhead, Associated Tie-Back Anchor Systems, and Concrete Cap
Post-Bid
$1,050,000 est. value
Fairhaven, MA 02719

Marine Construction Services
Results
Gloucester, MA 01930

MWRA Boat Storage Facility and Cosgrove Deck Drainage Improvements - Filed Sub Bids
Post-Bid
Less than $1,800,000 est. value
Clinton, MA 01510

Last Updated 06/10/2021 10:37 AM
Project Title

Moody Street Pier Removal

Physical Address View project details and contacts
City, State (County) Boston, MA 02124 (Norfolk, Suffolk Counties)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Moody Street Pier Removal: Removing the existing Pier including, but not limited to, all labor and materials associated with timber pier demolition, installation of pedestrian railings and minor bulkhead concrete repairs, along with floating debris control, site preparation, and staging and access.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents