Similar Projects
Gatehouse Windows Replacement at Franklin Falls Dam, Franklin, NH
Design
$250,000 to $500,000 est. value
Franklin, NH

Door Maintenance Services
Bidding
Bedford, Dover, Hampton, Hooksett, Nashua, Rochester, NH

Door Maintenance Services
Bidding
Bedford, Dover, Hampton, Hooksett, Nashua, Rochester, NH

Tardif Park House Door and Frame Replacement
Post-Bid
Laconia, NH

Solarium Windows With Installation at the Lisbon Regional School
Post-Bid
Lisbon, NH 03585

Keene Army Reserve Center Exterior Doors
Results
$25,000 to $100,000 est. value
Keene, NH 03431

Rockingham County Complex - Replacement Doors
Results
Brentwood, NH

Window Replacement and Associated Work at the Kennett High School
Post-Bid
Conway, NH 03860

UNH New Hampshire Hall Window Replacements and Exterior Painting
Results
Durham, NH 03264

Central Fire Station Overhead Doors
Post-Bid
Derry, NH 03038

Windows Replacement at Alton Central School
Results
Alton, NH

KSC- Carle Hall Door and Lock Replacement
Results
Keene, NH 03431

Doors, Frames, and Hardware
Results
Henniker, NH

Replacement of Exterior Window Project for Wakefield School District
Results
Wakefield, NH 03872

Replacement of Locks and Doors at WRBP Facilities
Results
Franklin, NH 03235

Last Updated 11/18/2020 09:07 AM
Project Title

Boucher Entrance Doors

Physical Address View project details and contacts
City, State (County) Concord, NH   (Merrimack County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the removal of all existing entrance doors with their respective frames to remain, storm doors and storefronts, including storefront doors and curtain system; the installation of new fiberglass entrance doors (as supplied by the owner) without storm doors, composite thresholds, C.R. Laurence Storefronts, including storefront doors and curtain system (not supplied by the owner), new lever-handled locksets, keyed deadbolts; project additionally includes the mortising of new doors to match the previous location of hinges and the scraping, priming and painting of existing metal door frames.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents