Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

Advanced Metering Infrastructure (AMI) System
Infrastructure
Bidding
Rio Rancho, NM

118 Waterline and Ford Drive Sewer Line and Concrete Paving Replacement
Infrastructure
Bidding
Gallup, NM 87301

Lift Station 1 Rehabilitation and New Force Main
Post-Bid
Rio Rancho, NM 87124

Construction of Water System Improvements - Phase II
Post-Bid
Red River, NM 87558

Advanced Metering Infrastructure
Results
Less than $963,817 est. value
Truth or Consequences, NM 87901

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

10" Waterline Extension
Infrastructure
Bidding
El Prado, NM

Water System Valve Replacement
Post-Bid
Roswell, NM 88201

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

Construction of Navajo Gallup Water Supply Project Reach 27.10
Post-Bid
Gallup, NM 87305

Hemlock Circle Waterline Replacement Phase II
Results
$430,000 est. value
Ruidoso, NM

Los Brazos Water System Improvements
Post-Bid
Less than $65,000 est. value
Tierra Amarilla, NM

Water System Improvements
Results
Less than $1,082,681 est. value
Tularosa, NM

Wastewater and Water System Improvements Project
Post-Bid
Cimarron, NM 87714

Last Updated 07/07/2021 03:18 PM
Project Title

La Cueva MDWCA Water System Improvements Project

Physical Address View project details and contacts
City, State (County) Santa Fe, NM   (Santa Fe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of approximately 3,035 linear feet (LF) of 4-inch PVC waterline including water service connections, meters, valves, hydrants, and appurtenances. Approximately 100 LF of waterline will be installed via Jack & Bore for NMSR-50 crossings and 215 LF of 4-inch HDPE will be installed via directional drilling for a wash crossing.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents