Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Post-Bid
$180,000 est. value
Ely, IA

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

8th Avenue South West from 15th Street South West to Rockford Road
Results
$3,220,000 est. value
Cedar Rapids, IA 52407

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

2022 Excelsior Middle School Parking Lot
Infrastructure
Post-Bid
Marion, IA 52302

2021 Curb and Gutter Rehabilitation
Infrastructure
Results
Less than $890,000 est. value
Cedar Rapids, IA 52405

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

Reconstruction Long Term Parking Lot E, Construction Long Term Parking Lot G & H2 Expansion Phase 2
Infrastructure
Post-Bid
Cedar Rapids, IA 52404

Derecho Sidewalk, Driveway and Miscellaneous Pavement Repair
Infrastructure
Results
$350,000 est. value
Cedar Rapids, IA

Lindale Trail Phase II from I-380 to Council Street North East
Conception
$1,200,000 est. value
Cedar Rapids, IA

Business 30 Resurfacing and Improvements
Infrastructure
Results
Mount Vernon, IA

Wiley Boulevard Trail from Williams Boulevard to 16th Street SW
Conception
$1,293,385 est. value
Cedar Rapids, IA 52407

Last Updated 02/16/2022 05:23 AM
Project Title

PCC Sidewalk/Trail

Physical Address View project details and contacts
City, State (County) Marion, IA   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In The City Of Marion, 10th St, Over Indian Crk, From Tower Terrace Rd South 2.1 m To Boyson Trail North Of 8th Ave 14.00 Each Aprons 2.20 Acre Clearing & Grubbing 1.00 Lump Sum Construction Survey 21.00 Linear Foot Culvert Pipe 28.00 Linear Foot Culvert, Precast 3,832.00 Cubic Yard Embankment-In-Place 1,901.00 Square Yard Engineering Fabric 3,528.90 Cubic Yard Excavation Class 10 454.00 Cubic Yard Excavation Class 20 34.00 Cubic Yard Modified Subbase 17.85 Station Pavement Markings 174.90 Square Yard Pavement, p.c.c. 1,260.00 Linear Foot Pile, Steel h, 10 In. 90.00 Linear Foot Posts, Metal, For Signs 62.00 Linear Foot Rail, Metal 10,223.00 Square Yard Recreational Trail, Pcc 17,994.00 Pound Reinforcing Steel, Epoxy Coated 1,310.80 Square Yard Removal Of Pvmnt/Drives/Sdwk 1,811.00 Ton Revetment 2.40 Acre Seeding & Fertilizing 175.20 Station Shoulder Finishing 175.00 Square Yard Sidewalk, p.c.c. 28.30 Square Foot Signs, Type a 9,417.00 Linear Foot Silt Fence 106.40 Cubic Yard Structural Concrete 1,992.00 Pound Structural Steel 1,132.00 Linear Foot Subdrain 1,850.00 Cubic Yard Topsoil, Strip/Salvage/Spr

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents