Similar Projects
Sidewalk Improvements - Central, Gunn, Park and Pratt Streets
Infrastructure
Results
$380,000 est. value
Erving, MA

Reconstruction of Parking Lot and Sidewalk
Results
Orange, MA

Hope Street Sidewalk Replacement
Infrastructure
Results
Less than $90,000 est. value
Greenfield, MA 01301

Sidewalk and ADA Improvements at Various Locations
Results
Less than $1,148,661 est. value

Orange Shared Streets Project
Infrastructure
Results
$169,000 est. value
Orange, MA

Sidewalk and ADA Improvements and Related Work at Various Locations
Results
Less than $841,030 est. value

South End Parking Area Paving, Elm Terrace 667-2
Results
Less than $20,000 est. value
Greenfield, MA 01301

Newton School Parking Lot Improvments
Infrastructure
Results
$62,570 est. value
Greenfield, MA 01301

Lake Wallace Sensory Trail
Results
$119,097 est. value
Greenfield, MA

Western Ma Road and Trail Improvements
Results
$4,000,000 est. value
Franklin, Hampden, Worcester, MA

Sidewalk Repairs and Improvements at Various Locations
Infrastructure
Results
$175,000 est. value

Avenue A Streetscape Improvements
Infrastructure
Bidding
$258,000 est. value
Turners Falls, MA

Pavement Improvements
Results
$46,500 est. value
Orange, MA 01364

Colrain Street Sidewalk Replacement and ADA Improvements
Results
$170,000 est. value
Greenfield, MA 01301

Sanderson Street Improvements - Phases 1 and 2
Infrastructure
Post-Bid
$1,650,000 est. value
Greenfield, MA 01301

Last Updated 01/18/2022 03:53 PM
Project Title

Shared Streets Pedestrian Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Greenfield, MA   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Scope Elements of the Project include (but are not limited to, see Plans in Attachment C) * A new section of sidewalk on the east side of Elm Street from Allen Street to the intersection of Elm Street and Elm Terrace (approximately 250 linear feet); * A newly constructed widened section of sidewalk on Elm Terrace connecting to the intersection of Elm Street and Elm Terrace (approximately 60 linear feet); * Construction of new bus stop waiting areas on the east and west sides of Elm Street and Elm Terrace (for the northbound and southbound buses) with new concrete pads, a crosswalk, signs, and curb ramps; * A new bus shelter with a bike rack at the bus stop on the east side; * A new shelter at the bus stop on the west side; and * An improved curb-ramp on the east side of the intersection of Elm Street and Allen Street. All elements of the plans must meet the Americans with Disabilities (ADA) requirements. See Design Plans in Attachment C (under separate cover). All work is to be completed no later than June 20, 2022 due to grant deadline.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents