Similar Projects
Last Updated | 07/20/2020 08:16 AM |
Project Title | 6.012 Miles of Widening, Resurfacing and Shoulder Rehabilitation on St Johns Church Rd (CR 349) Beginning at SR 121 and Extending US 84 |
Physical Address | View project details and contacts |
City, State (County) | GA (Pierce County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Section No.: 0001 Roadway 165-0010 Maintenance Of Temporary Silt Fence, Tp a 100.000 Lf 171-0010 Temporary Silt Fence, Type a 200.000 Lf 207-0203 Found Bkfill Matl, Tp Ii 8.000 Cy 210-0200 Grading Per Mile 6.012 Lm 231-1250 Miscellaneous Construction, Unpaved Roads, Streets And Driveways 15.000 Ea 402-1802 Recycled Asph Conc Patching, Incl Bitum Matl & h Lime 600.000 Tn 429-1000 Rumble Strips 15.000 Ea 550-1240 Storm Drain Pipe, 24 In, h 1-10 48.000 Lf 550-4224 Flared End Section 24 In, Storm Drain 2.000 Ea 700-6910 Permanent Grassing 6.000 Ac 700-7000 Agricultural Lime 12.000 Tn 700-8000 Fertilizer Mixed Grade 4.000 Tn 700-8100 Fertilizer Nitrogen Content 300.000 Lb 713-3012 Wood Fiber Blanket, Tp Ii, Shoulders 29,040.000 Sy 999-0125 Lump Sum Resurfacing - 0016295 1.000 Ls |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |