Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Mixed Use Project
New Construction
Conception
$1,150,000 est. value
Salt Lake City, UT 84102

Walmart Supercenter #5350-242 - OGP
Renovation - 108,996 SF
Design
Salt Lake City, UT 84117

Smith's #133-06
Renovation
Design
Salt Lake City, UT 84107

Sam's Club #4730-233 - SPRB-R
Renovation - 130,595 SF
Bidding
West Jordan, UT 84084

Sam's Club #6683-238 - SP
Renovation - 131,292 SF
Bidding
Murray, UT 84107

Slate Multi-Family Mixed Use
New Construction - 123,140 SF
Post-Bid
$5,094,463 est. value
Salt Lake City, UT 84101

Millcreek Commons
Post-Bid
Less than $670,000 est. value
Millcreek, UT 84106

Development of Property at 695 W. 5Th Ave/7555 S. Main Street
New Construction
Results
$1,000,000 to $5,000,000 CJ est. value
Midvale, UT 84047

Walmart Supercenter #3568-232 - OGP-GB2
Renovation - 850 SF
Construction
$37,760 est. value
West Valley City, UT 84120

Mountain View Village Phase II
New Construction - 4,023,000 SF
Construction
Riverton, UT 98096

Mixed Use Development
New Construction
Pending Verification
Murray, UT 84107

Mountain Point Retail
New Construction - 8,400 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Herriman, UT 84065

Transit Area Mixed Use
New Construction
Conception
Salt Lake City, UT 84111

Smith's #028-04
Renovation
Design
Salt Lake City, UT 84106

Reported 04/09/2022 12:00 AM
Project Title

DFCM Construction-DABC Salt Lake City Store Relocation - CM/GC

Physical Address View project details and contacts
City, State (County) Taylorsville, UT 84129   (Salt Lake County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $21,800,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Construction Management/General Contractor (CM/GC) project includes: This CM/GC project consists of a new 14,400 square feet two story liquor store and an approximately 158,000 square feet 10 story parking garage that will be constructed in downtown Salt Lake City on Broadway and Edison on an existing parking lot. The new building will be constructed up to the property line and will house a variety of spaces including: multilevel retail sales, storage, office, restrooms, built-in coolers, break room, lockers, an attached 10 story parking structure with fire suppression system and water storage, and a raised first level of the parking garage for a shipping/loading dock. Entry to the store will be accessed by way of the parking structure and Broadway. Estimate - Construction cost is estimated at: $21,800,000 with approximately $5,800,000 for the liquor store, approximately $5,800,000 for roughly 63,000 SF of the lowest levels of the parking garage, and roughly $10,200,000 for the six highest levels of the parking garage.

Details

Retail, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents