Similar Projects
Tusquitee Office Restoration
Infrastructure
Bidding
$100,000 CJ est. value
Murphy, NC 28906

On-call Concrete Repair: Curb and Gutter, Sidewalk, Curb Ramps, and Driveway Installation
Term Contract
Post-Bid
Murphy, NC 28906

Curb Ramps, Sidewalk, Pavment Marking, and Traffic Control
Infrastructure
Post-Bid
$1,653,283 CJ est. value
Murphy, NC 28906

Milling, Paving, Curb Ramps, Pavement Marking, and Traffic Control
Infrastructure
Results
$5,000,000 est. value
NC

Milling, Paving, Curb Ramps, Pavement Marking, and Traffic Control
Infrastructure
Results
$5,000,000 est. value
NC

New Airfield Edge Lighting, Signage, and NAVAIDS
Infrastructure
Post-Bid
$931,369 CJ est. value
Andrews, NC 28901

Curb Ramps, Sidewalk, Curb and Gutter, Pavement Marking, and Traffic Control
Infrastructure
Results
$299,485 CJ est. value
Murphy, NC 28906

Curb Ramps, Sidewalk, Pavement Marking, and Traffic Control
Infrastructure
Post-Bid
$1,031,560 CJ est. value
Murphy, NC 28906

WWTP Improvements Influent Pump Station Upgrades
Infrastructure
Results
$368,500 CJ est. value
Andrews, NC 28901

Mill, Patch, Leveling, Shoulder Reconstruction, Pavement Marking, Traffic Control
Infrastructure
Post-Bid
$2,976,069 CJ est. value
Murphy, NC 28906

Last Updated 08/22/2023 02:11 PM
Project Title

Curb Ramps, Sidewalks, Curb & Gutter at Various Counties

Physical Address View project details and contacts
City, State (County) Murphy, NC 28906   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No.: DN01026 WBS: 44910.3.14 Federal Aid No.: 1420023 County Cherokee, Clay, Graham, And Macon Location: Various Routes Throughout Cherokee, Clay, Graham, And Macon Counties Description: Curb Ramps, Sidewalks, Curb & Gutter Project Length: Varies Question Deadline 08/15/2023 Questions should be emailed to Jeffrey E. Alspaugh, EI at D14Contracts@ncdot.gov 7 calendar days prior to the bid opening Regulations of the Department of Transportation (49 C.F.R., Part 21), issued pursuant to such act, hereby notifies all bidders that it will affirmatively ensure that the contract entered into pursuant to this notice will be awarded to the lowest responsible bidder without discrimination on the grounds of sex, race, color, or national origin. Statements of Disadvantage Business Enterprises participation must be presented with the bids Questions should be directed to Jaci Kincaid at 919-707-6920. NC DOT - Curb Ramps, Sidewalks, Curb & Gutter at Various Counties

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents