Similar Projects
Dredging of Alum Sludge Pond
Bidding
Port Wentworth, GA 31407

Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging
Term Contract
Bidding
Savannah, GA

FY20 Savannah Inner Harbor Maintenance Dredging
Post-Bid
$10,000,000 to $25,000,000 est. value
Savannah, GA 31401

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

South Atlantic Regional Harbor Dredging
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

Placentia Canal Drainage Improvements
Results
Savannah, GA 31401

Fiscal Year (FY) 21 Brunswick Inner Harbor Maintenance Dredging
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Savannah, GA

Pipe Makers Canal Improvements - Division 1
Post-Bid
Pooler, GA

Chatham Parkway Outfall Drainage and Access Improvements
Results
Savannah, GA 31416

SHEP Sediment Basin Rock Weir and Fill Design
Term Contract
Bidding
$25,000,000 to $50,000,000 est. value
Savannah, GA

Pipe Makers Canal Improvements - Division 2 Canal Maintenance
Post-Bid
Pooler, GA

South Atlantic Division Regional Harbor Dredging Contract FY21
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

Roadway, Water, and Wastewater Improvements for theHardeeville Commerce Park
Post-Bid
Hardeeville, SC

Forest Lakes Drainage Canal Improvements
Results
Less than $388,340 est. value
Pooler, GA 31322

Ga-Wassaw NWR Expedite Bulkhead Wingwall
Post-Bid
$275,000 to $300,000 est. value
GA

Last Updated 05/21/2021 09:03 AM
Project Title

Savannah Harbor DMCA 1N Dike Raising

Physical Address View project details and contacts
City, State (County) Port Wentworth, Savannah, GA   (Chatham (GA) - Jasper (SC) County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Savannah Harbor DMCA 1N is approaching maximum capacity and will soon be unable to be used for dredge material containment. The proposed project includes clearing, grubbing and raising the perimeter dike around the 130-acre dredged material containment area (DMCA) along with the entrance ramp and the two southernmost pipe ramps, raising the existing cross-dike along with its existing double-barrel weir/water control structures, and raising both existing weir/water control structures in the southeast corner of the DMCA. The existing perimeter dike currently has a crest elevation of approximately 26 feet MLLW. After clearing and grubbing, the dike will be raised to a uniform elevation of 33 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. An extension of the weir-riser will be added to the existing weir structures. The cross dike extending north/south will be raised to a crest elevation of 31 feet MLLW. Construction activities within the water will take place utilizing barges, activities that are on land will require the use of heavy civil construction equipment to include cranes, excavators, dump trucks, rollers, etc. Several rock quarries have been identified within a 20 mile radius of the project area. Weir stones will be sourced from local rock quarries. The river is prone to varying water levels due to rainfall and regulated releases from J. Strom Thurmond Dam.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents