Project Title | Savannah Harbor DMCA 1N Dike Raising |
Physical Address | View project details and contacts |
City, State (County) | Port Wentworth, Savannah, GA (Chatham (GA) - Jasper (SC) County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Savannah Harbor DMCA 1N is approaching maximum capacity and will soon be unable to be used for dredge material containment. The proposed project includes clearing, grubbing and raising the perimeter dike around the 130-acre dredged material containment area (DMCA) along with the entrance ramp and the two southernmost pipe ramps, raising the existing cross-dike along with its existing double-barrel weir/water control structures, and raising both existing weir/water control structures in the southeast corner of the DMCA. The existing perimeter dike currently has a crest elevation of approximately 26 feet MLLW. After clearing and grubbing, the dike will be raised to a uniform elevation of 33 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. An extension of the weir-riser will be added to the existing weir structures. The cross dike extending north/south will be raised to a crest elevation of 31 feet MLLW. Construction activities within the water will take place utilizing barges, activities that are on land will require the use of heavy civil construction equipment to include cranes, excavators, dump trucks, rollers, etc. Several rock quarries have been identified within a 20 mile radius of the project area. Weir stones will be sourced from local rock quarries. The river is prone to varying water levels due to rainfall and regulated releases from J. Strom Thurmond Dam. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |