Similar Projects
Purchase, Inspection, Service and Repair of Fire Extinguishers
Alteration
Bidding
GA

Inspection and Testing of Fire Sprinkler Systems - Annual Contract
Term Contract
Bidding
GA

Annual and Five Year Sprinkler Inspection
Term Contract
Post-Bid
Rome, GA 30161

Fire Alarm Inspection and Certification
Term Contract
Post-Bid
Augusta, GA 30912

Sprinkler System Upgrade
Results
Less than $1,227,000 est. value
Forsyth, GA

Law Enforcement Center Fire Alarm System Upgrade
Results
Less than $500,000 est. value
Covington, GA 30014

Alarm Monitoring Maintenance Inspection and Service of Security Fire Alarm and Access Systems
Post-Bid
Decatur, GA

Fire Sprinkler System for Nash Farms
Results
Less than $309,542 est. value
Hampton, GA 30228

Fire Extinguisher and Fire Suppression Systems Service
Post-Bid
GA

Fire Extinguisher Service and Maintenance
Term Contract
Results
Augusta, GA 30901

Fire Suppression Service
Post-Bid
Moody AFB, GA

Fire Doors Service and Replacement
Results
Warner Robins, GA 31098

Annual Fire Extinguisher and Vent Inspection
Term Contract
Post-Bid
GA

Fire Protection Buildings 100, 200 and 600
Results
Valdosta, GA 31602

Fire Suppression
Term Contract
Post-Bid
Barnesville, GA 30204

Last Updated 01/04/2022 11:34 PM
Project Title

Courthouse Fire Pump Relocation

Physical Address View project details and contacts
City, State (County) Savannah, GA 31401   (Chatham County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The work consists of relocating fire pump equipment to a new rated enclosure adjacent to future tunnel location. Remove existing fire pump, jockey PumP, and associated control panels. Remove concrete pads at existing equipment locations, and remove portions of concrete slab to relocate/install 3 floor drains. Relocate ballast tank near future tunnel location. Furnish and install new floor drains. Repair concrete at floor drain locations, and install new concrete equipment pads. Furnish and install new fire pump, jockey PumP, piping, and associated control pun.tr within new 2-hour fire-rated room. Route new electrical service from the utility provider underground vault to the courthouse underground vault, and provide 2-hour rated enclosure over electrical service components to the new fire pump location. Provide 90-minute rated hollowmetal door and frame, interior lighting, and emergency fixture to new fire pump room. Paint interiors to match adjacent walls and doors/frames.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents