Similar Projects
Upper Leon Creek-Government Canyon Regional Rswf
Bidding
Less than $7,410,378 est. value
San Antonio, TX 78205

Pedestrian Crossing Improvements at Royalgate and Military Drive
Bidding
San Antonio, TX 78242

Gibbs Sprawl Drainage Improvements
Post-Bid
Converse, TX 78109

Walking Track - Copperfield Elementary School
Post-Bid
Converse, TX 78109

OP Schnabel Park Entrance and Bridge
Results
$783,000 est. value
San Antonio, TX

New Asphalt Parking Lot at 811 Jackson Street
Results
Less than $88,075 est. value
San Antonio, TX 78200

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Bidding
Olmos Park, TX

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Concrete Repair and Replacement
Term Contract
Results
Schertz, TX 78154

Watershed III Drainage Improvements - Phase I (Banyan Drive and Glentower Drive)
Post-Bid
San Antonio, TX 78213

Maverick Creek Trail Connection
Results
$1,700,000 est. value
San Antonio, TX 78205

Drainage Upgrades at Valley Hi Elementary School
Post-Bid
San Antonio, TX 78227

Lone Star Erosion Repair
Results
San Antonio, TX 78200

River Walk Improvements Phase VI
Post-Bid
Less than $2,850,000 est. value
San Antonio, TX 78205

FY 2020 Flatwork TOC Package 6
Results
$2,500,000 est. value
San Antonio, TX 78205

Last Updated 07/27/2020 08:03 AM
Project Title

Brooks City Base Inner Circle Rd. (Louis Bauer Dr. to Research Plaza)

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,151,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes extension of Inner Circle from Louis Bauer Drive to Research Plaza consisting of a three-lane roadway with bike lanes, curb, sidewalks, and driveway approaches as necessary. Drainage improvements consisting of an underground drainage system. Low Impact Development (LID) features within the project limits. Landscaping improvements consisting of the construction of various trees and plants within the parkway along the Inner Circle Road. Utility improvements consisting of water main, sewer main, recycled water main, CPS Gas and underground electric conduit and underground duct bank.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents