Last Updated | 03/13/2023 02:35 AM |
Project Title | West Side Park and Leonard-Leota Park Improvements (Rebidding) |
Physical Address | View project details and contacts |
City, State (County) | Evansville, WI 53536 (Rock County) |
Category(s) | Entertainment/Recreation, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s), Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,791,788 [brand] Estimate |
Plans Available from | Architect - 05/19/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Category Code: Electrical and Controls, Plumbing, Paving (Asphalt or Concrete), Parks, Recreation, Buildings & Facilities, Buildings and Grounds/Athletic/Sports Facilities, Mechanical Systems, Masonry Construction & Restoration, Sitework/Excavating and Grading, Landscaping, Buildings Commercial and Private. PROJECT INCLUDES the development of a new aquatic and park improvements at West Side Park and the removal of their existing aquatics facility at Leonard-Leota Park and the installation of a new splash pad with associated site developments. The aquatics facility includes an interconnected children's pool, recreational pool, lazy river, and water slide complex along with other aquatic features. West Side Park amenities include, but not limited to a concrete and asphalt multi-use paths/sidewalks, asphalt parking lots, baseball field, softball field, soccer field improvements, multi-sport court and associated work. The buildings include a Bath House and Pool Equipment Building. Buildings have concrete foundations, masonry walls and sloped wood roof trusses. Other items included in this overall project, but not limited to, are excavation, erosion control, storm sewer, sanitary sewer, water lines, irrigation, landscaping, and concrete curb and gutter. PROPOSED SCHEDULE is to tentatively award the work by June 14, 2022. Project completion is desired in the May 21, 2024. |
||||||||||||||||||||||||||||||||||||
Details | Park/Playground, Renovation.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |