Similar Projects
Edward's Auto Fuel Station/Convenience Store
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Charlton, MA 01507

Corrosion Materials Expansion
Addition, Demolition, Infrastructure
Conception
$1,000,000 CJ est. value
Auburn, MA 01501

Westboro Road Mixed-Use Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
North Grafton, MA 01536

New Doherty Memorial High School - Concrete / Steel Package
Addition, Demolition, New Construction, Renovation, Infrastructure - 421,858 SF
Design
$240,000,000 CJ est. value
Worcester, MA 01602

Wachusett Dam Lower Gatehouse Pipe and Boiler Replacement - General Bid
Renovation, Infrastructure
Bidding
$11,064,000 CJ est. value
Clinton, MA 01510

Sewer Plant Operations
Infrastructure
Bidding
$65,000 CJ est. value
Winchendon, MA 01475

Installation of 86 Toilets for Maxi-C Unît
Renovation
Sub-Bidding
$125,000 CJ est. value
West Boylston, MA 01583

Asbestos/Haz-Mat Monitoring and Testing - Worcester Public Schools (WPS)
Term Contract
Sub-Bidding
Worcester, MA 01608

Legacy Labs
Build-Out - 7,200 SF
Post-Bid
$646,000 est. value
Worcester, MA 01603

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Excavation and Paving Services
Term Contract, Infrastructure
Results
$100,000 est. value
Worcester, MA

Longsjo School Crawlspace Abatement
Alteration
Results
Fitchburg, MA 01420

Worcester County Welding Addition
Addition - 8,100 SF
Construction
Leicester, MA 01542

Shrewsbury Maple Retail Office
New Construction, Addition - 2,000 SF
Construction
Shrewsbury, MA 01545

Millbury Street Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Worcester, MA 01607

Last Updated 09/28/2022 07:34 PM
Project Title

MACA Grow Facility

Physical Address View project details and contacts
City, State (County) Hopedale, MA 01747   (Worcester County)
Category(s) Heavy and Highway, Industrial/Manufacturing, Single Trades
Sub-Category(s) Environmental, Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a grow facility. Please direct all bids/inquiries to the general contractor. Pricing is being done with 30% DD drawings. Construction is slated to commence Spring 2023. Geotechnical memo has been issued as of 9-27-2022 - scope sheets are forthcoming.

Details

15,782 SF.
Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Subsurface Investigation, Site Remediation, Asbestos Remediation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents