Similar Projects
Tidal Wave Auto Spa / Muscle Shoals
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Muscle Shoals, AL 35661

Bank Independent Operations Center
New Construction, Infrastructure - 95,000 SF
Design
$60,000,000 CJ est. value
Muscle Shoals, AL 35660

Synthetic Turf Field Project at Muscle Shoals High School Stadium and Indoor
Infrastructure
Bidding
$600,000 CJ est. value
Muscle Shoals, AL 35661

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Muscle Shoals Water Treatment Plant Improvements
Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Muscle Shoals, AL 35661

Constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-13 (US-43) from 0.300 mile south of the Junction of CR-61 to 0.110 mile south of the Intersection of SR-2 (US- 72) south of Muscle Shoals
Infrastructure
Results
$2,955,882 to $3,612,745 est. value
AL

Addition to Deshler High School Tuscumbia, Alabama
Addition, Demolition, Infrastructure
Results
$3,089,100 CJ est. value
Tuscumbia, AL 35674

RaceTrac Travel Center #1508 / Muscle Shoals
New Construction, Infrastructure - 8,702 SF
Post-Bid
$2,000,000 CJ est. value
Tuscumbia, AL 35674

2022 TAP Sidewalk Projects
Infrastructure
Results
$310,088 CJ est. value
Muscle Shoals, AL 35661

Micro-Milling, Resurfacing, and Traffic Stripe on SR-133
Infrastructure
Results
$1,864,410 CJ est. value
Muscle Shoals, AL 35661

Micro-Milling, Resurfacing, and Traffic Stripe on SR-13 (US-43)
Infrastructure
Results
$3,164,021 CJ est. value
Tuscumbia, AL 35674

Last Updated 02/06/2023 06:32 PM
Project Title

Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-247

Physical Address View project details and contacts
City, State (County) Tuscumbia, AL 35674   (Colbert County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,295,285 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Colbert Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-247 from the Franklin County Line to a point 1.250 miles south of the junction of CR-33. Length 3.574 mi. The Bracket Estimate on this project is from $1,091,698 to $1,334,298 . Contract Time: 35 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 054 - Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-247 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents