Similar Projects
Last Updated | 09/08/2022 05:35 PM |
Project Title | Accessibility Ramp Additions - Humphrey and Jorns Halls |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53706 (Dane County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $233,080 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the work consists of the addition of new accessible basement entrances and exterior accessible concrete ramps from grade to the basement level of both Humphrey and Jorns Halls on the University of Wisconsin - Madison campus. The work includes a concrete ramp with retaining walls, exterior door, power door operator and site drain at the exterior door. Interior steam piping will be rerouted around the new exterior doors by the owners. Installation of plumbing work and all work shown on the architectural drawings is included in the project. All Mechanical and Electrical work will be performed by the owner and timing of this work will need to be coordinated with work being performed as part of the project scope. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014.Contractor certification applications and instructions for completing the form may be obtained from the DOA electronically. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |