Similar Projects
Last Updated | 05/19/2021 06:55 AM |
Project Title | Grading, Drainage, Paving, and Structures |
Physical Address | View project details and contacts |
City, State (County) | NC (Lenoir County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bridges #52 And #152 Over The Neuse River Overflow On Sr-1389 Lump Sum Ls Mobilization Lump Sum Ls Construction Surveying Lump Sum Ls Type I Standard Approach Fill Station (30+80.00 -L-) Lump Sum Ls Type Ii Modified Approach Fill, Station (23+06.50 -L-) 300 Cy Undercut Excavation Lump Sum Ls Grading 1 Acr Supplementary Clearing & Grubbing 300 Cy Select Granular Material 300 Sy Geotextile For Soil Stabilization 320 Ea Generic Grading Item Hauling Ncdot Supplied Material 25 Ton Foundation Conditioning Material, Minor Structures 70 Sy Foundation Conditioning Geotextile 100 Lf 15" Drainage Pipe 6 Ea **" Drainage Pipe Elbows (15") 108 Lf 15" Rc Pipe Culverts, Class Iv 85 Ton Aggregate Base Course 313 Ton Incidental Stone Base 8.52 Smi Shoulder Reconstruction 2,000 Sy Milling Asphalt Pavement, To (0" To 2-1/2") 1,500 Sy Incidental Milling 4,090 Ton Asphalt Conc Base Course, Type B25.0c 7,950 Ton Asphalt Conc Intermediate Course, Type I19.0c 790 Ton Asphalt Conc Surface Course, Type S9.5b 4,700 Ton Asphalt Conc Surface Course, Type S9.5c 901 Ton Asphalt Binder For Plant Mix 150 Ton Patching Existing Pavement 44.8 Cy Subdrain Excavation 200 Sy Geotextile For Subsurface Drains 33.6 Cy Subdrain Coarse Aggregate 200 Lf 6" Perforated Subdrain Pipe 1 Ea Subdrain Pipe Outlet 6 Lf 6" Outlet Pipe 6 Ea Masonry Drainage Structures 6 Ea Frame With Two Grates, Std 840.29 100 Lf Shoulder Berm Gutter 1,000 Lf Steel Beam Guardrail 5 Ea Additional Guardrail Posts 4 Ea Guardrail Anchor Units, Type Iii 6 Ea Guardrail End Units, Type Tl-3 6 Ea Guardrail Anchor Units, Type B-77 340 Lf Remove Existing Guardrail 1 Ton Rip Rap, Class B 1,745 Sy Geotextile For Drainage 2 Ea Preformed Scour Holes With Level Spreader Apron 20 Lf Supports, 3-Lb Steel U-Channel 2 Ea Sign Erection, Type D 2 Ea Disposal Of Sign System, Uchannel 8 Ea Disposal Of Sign System, Wood 621 Sf Work Zone Signs (Stationary) 144 Sf Work Zone Signs (Barricade Mounted ) 480 Sf Work Zone Advance/General Warning Signing 42 Day Portable Changeable Message Sign (Short Term) 144 Lf Barricades (Type Iii) Lump Sum Ls Temporary Traffic Control 4,040 Lf Thermoplastic Pavement Marking Lines (4", 90 Mils) 1,960 Lf Generic Pavement Marking Item Polyurea Pavement Marking Lines, 4", 20 Mils (Standard Glass Beads) 3,560 Lf Temporary Silt Fence 100 Ton Stone For Erosion Control, Class A 30 Ton Stone For Erosion Control, Class B 545 Ton Sediment Control Stone 5 Acr Temporary Mulching 300 Lb Seed For Temporary Seeding 1.5 Ton Fertilizer For Temporary Seeding 200 Lf Temporary Slope Drains 1,600 Lf Safety Fence 30 Cy Silt Excavation 2,060 Sy Matting For Erosion Control 100 Sy Coir Fiber Mat 240 Lf 1/4" Hardware Cloth 200 Sy Floating Turbidity Curtain 16 Ea Special Stilling Basins 550 Lf Coir Fiber Wattle 1,265 Lf Coir Fiber Wattle Barrier 20 Lf Coir Fiber Baffle 12.39 Acr Seeding & Mulching 3 Acr Mowing 50 Lb Seed For Repair Seeding 0.25 Ton Fertilizer For Repair Seeding 100 Lb Seed For Supplemental Seeding 2.5 Ton Fertilizer Topdressing 10 Mhr Specialized Hand Mowing 102 Ea Response For Erosion Control 2 Ea Concrete Washout Structure 0.1 Acr Reforestation Lump Sum Ls Construction, Maintenance, And Removal Of Temp Access At Sta (30+80.00-L-) Lump Sum Ls Removal Of Existing Structure At Station (23+06.50-L-) Lump Sum Ls Removal Of Existing Structure At Station (30+80.00-L-) Lump Sum Ls Asbestos Assessment 729 Lf Dia Drilled Piers (4'-6") 167 Lf Permanent Steel Casing For " Dia Drilled Pier (4'-6") 3 Ea Pda Testing 2 Ea Sid Inspections 3 Ea Spt Testing 4 Ea Csl Testing Lump Sum Ls Unclassified Structure Excavation At Station(23+06.50-L-) Lump Sum Ls Unclassified Structure Excavation At Station (30+80.00-L-) 17,592 Sf Reinforced Concrete Deck Slab 15,633 Sf Grooving Bridge Floors 321.4 Cy Class A Concrete (Bridge) Lump Sum Ls Bridge Approach Slabs, Station (23+06.50-L-) Lump Sum Ls Bridge Approach Slabs, Station (30+80.00-L-) 125,251 Lb Reinforcing Steel (Bridge) 23,994 Lb Spiral Column Reinforcing Steel (Bridge) 28 Ea Pile Driving Equipment Setup For Steel Piles (Hp 12 X 53) 24 Ea Pile Driving Equipment Setup For Galvanized Steel Piles (Pp 18 X 0.50) 1,918 Lf Hp12x53 Steel Piles 2,040 Lf Pp 18 X 0.50 Galvanized Steel Piles 28 Ea Pile Redrives 919.5 Lf Concrete Barrier Rail 421 Lf Vertical Concrete Barrier Rail 955 Ton Rip Rap Class Ii (2'-0" Thick) 1,061 Sy Geotextile For Drainage Lump Sum Ls Elastomeric Bearings Lump Sum Ls Foam Joint Seals 2,730 Lf 3'-0" X 2'-0" Prestressed Conc Cored Slabs 1,833.33 Lf Generic Structure Item 36" Florida I-Beam (Fib) Girders |
||||||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |