Equipment, Sewage Treatment Plant Construction Project Lead, Louisville, KY 40211 (Jefferson County)
Last Updated | 08/03/2022 06:04 PM |
Project Title | MFWQTC Main Equipment Building (MEB) Roof Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Louisville, KY 40211 (Jefferson County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Equipment, Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results, |
Bids Due | View project details and contacts |
Estimated Value | $968,043 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 10, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The principal features of the Work to be performed under this Contract include, but are not limited to the following: A. The Contractor shall provide all materials, equipment, labor, supervision, incidentals and all other items necessary to complete the project in accordance with the requirements of the Contract Documents. The principal features of the Work to be performed under this Contract include, but are not limited to the following: 1. Demolition of existing spray polyurethane foam (SPF) and built up roof (BUR) roofing systems, down to the concrete roof deck, for the existing buildings shown in the Drawings. 2. Demolition of existing heating, ventilation, and air-conditioning (HVAC) equipment, as shown in the Drawings. 3. Removal and reinstallation of existing HVAC equipment. 4. Concrete roof deck repairs, as itemized on the Bid Form and shown in the Drawings. 5. New exhaust fans, as shown in the Drawings. 6. New polyvinyl chloride membrane roofing system, as shown in the Drawings. 7. New roof access hatch, roof perimeter guardrail and roof access ladder, as shown in the drawings. C. The foregoing description(s) shall not be construed as a complete description of all work required. The Engineer's Construction Cost Estimate for this project is between $500,000.00 and $2,000,000.00. All inquiries and questions prior to the bid opening shall be Directed, in writing, to MSD's Project Manager, Julie Potempa E-mail: julie.potempa@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If selected as applicable above, the goals are as follows: 18.0% MBE - African American, 2.0% MBE - Asian-Indian American and 15.0% WBE - Caucasian Female participation respectively required for this project. MBE and WBE businesses are encouraged to bid on this project as a prime contractor. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline for questions is 5:00 PM EDT, Wednesday, February 23, 2022 |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |