Similar Projects
Kent Island Senior Center - Queen Anne's County
Renovation, Infrastructure
Conception
$735,000 CJ est. value
Centreville, MD 21617

Boe Administration Building - Queen Anne's County
Renovation, Infrastructure
Conception
$14,000,000 CJ est. value
Centreville, MD 21617

Bay Bridge Marina Mixed Use Development
New Construction, Infrastructure - 130,303 SF
Design
$100,000,000 CJ est. value
Stevensville, MD 21666

Bay Bridge Marina Mixed Use Development
New Construction, Infrastructure - 130,303 SF
Design
$100,000,000 CJ est. value
Stevensville, MD 21666

Warning Track Work on Athletic Fields
Infrastructure
Bidding
$275,000 CJ est. value
Queenstown, MD 21658

Chesapeake Heritage and Visitor Center Site Improvement Project
Infrastructure
Bidding
$148,000 CJ est. value
Chester, MD 21619

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

High Friction Surface Treatment of Roadways at Various Locations - Statewide
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Kent Island High School Synthetic Running Track Replacement
Infrastructure
Construction
$264,415 CJ est. value
Stevensville, MD 21666

Log Canoe Circle Industrial Building - Lot 5
New Construction, Infrastructure - 90,000 SF
Construction
$48,300,000 CJ est. value
Stevensville, MD 21666

Armored Storage Kent Island
New Construction, Infrastructure - 156,000 SF
Pending Verification
$17,000,000 CJ est. value
Chester, MD 21619

The Gardens of Queen Anne's Phase 2
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Stevensville, MD 21666

Thompson Creek Bulkhead - Queen Anne's County
Infrastructure
Conception
$250,000 CJ est. value
Church Hill, MD 21623

Last Updated 03/29/2023 12:01 PM
Project Title

Little Kidwell Avenue Extension New Road Construction

Physical Address View project details and contacts
City, State (County) Centreville, MD 21617   (Queen Annes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $625,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the new construction of approximately five hundred twenty-three linear feet (523 lf) of closed section bituminous concrete roadway with Portland cement concrete curb/gutter, sidewalk and stormdrain over graded aggregate base and compacted subgrade. Additionally, the Work includes the installation of Filterra bioretention systems, street trees and peripheral demolition, drive entrance and site grading improvements. The Work is fully described and detailed in the contract documents. Refer to the Bid Documents for a complete description of work. The site is located on undeveloped right-of-way adjacent to 110 Vincit Street, Centreville, MD 21617. Bid Security is required to be submitted with the bid in accordance with the General Conditions. Completed Conflict of Interest Disclosure & Employment of Aliens Statement is required to be submitted with the bid. Failure to submit these with the bid shall deem the bid non-responsive. Bidders are directed to the provisions of the Instructions to Bidders for additional information governing the bidding process. The Owner reserves the right to waive any informalities and to reject any or all bids. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Bids are to remain open for 60 days. The Work shall be Substantially Completed not later than 150 calendar days ; The CONTRACTOR shall attain Final Completion within 15 calendar days of the issuance of Substantial Completion.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents