Similar Projects
H2A Housing
New Construction
Design
Huntersville, NC 28078

The College of William & Mary - Housing & Dining Comprehensive Facilities Plan - Phase 1
Demolition, New Construction, Renovation, Infrastructure
Design
$234,000,000 CJ est. value
Belhaven, NC 27810

Appalachian State University - Housing Structural Repairs
Renovation
Bidding
$400,000 CJ est. value
Boone, NC 28607

Student Housing Structural Remediations
Renovation
Bidding
$410,000 CJ est. value
Boone, NC 28607

Construction of a New 156-Bed Dormitory
New Construction - 35,000 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
Kittrell, NC 27544

TROSA West Dorm Building
New Construction, Infrastructure - 17,517 SF
Post-Bid
$4,000,000 CJ est. value
Durham, NC 27707

Bryant Hall and Vance Hall - Asbestos Abatement, Demo, and Site Restoration
Demolition - 96,680 SF
Results
$264,420 est. value
Fayetteville, NC 28301

Renovation of the WSSU Rams Commons Residence Hall
Renovation
Construction
Winston-Salem, NC

C.A. Dillon Youth Development Center Renovations - Phase B
Renovation
Construction
Butner, NC 27509

Blue Line Aviation School
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Smithfield, NC 27577

East Neighborhood Commons
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Elon, NC 27244

New Bluford Street Student Housing
New Construction, Infrastructure
Post-Bid
$58,000,000 CJ est. value
Greensboro, NC 27401

Elon University - Carolina Hall Renovations
Renovation - 2,983 SF
Construction
Elon, NC 27244

Renovation of the Susie Jones Alumnae House
Build-out, Renovation - 3,249 SF
Post-Bid
$1,000,000 CJ est. value
Greensboro, NC 27406

Belmont Abbey Dormitories
New Construction - 84,676 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Belmont, NC

Last Updated 04/10/2023 04:35 AM
Project Title

Fleming Residence Hall Renovations of HVAC Systems, Bathrooms, and Apartment

Physical Address View project details and contacts
City, State (County) Greenville, NC 27858   (Pitt County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,187,700 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Briefly, and without force and effect upon the contract documents, work is summarized as follows: Renovation of the existing 32,268 GSF, 2-story building with a basement. Renovations include the following: abatement of asbestos containing materials, complete renovation to (4) existing gang toilets with showers, a new laundry room in the coordinators apartment, remove textured ceiling from first and second floor corridors, replace light fixtures, remove and replace exterior waste line, and replace HVAC system throughout the building. The emergency generator, chiller, steam converter, all bedroom overhead light fixtures, ADA ramp, gender neutral bathrooms, manhole replacement, and coordinator apartment finishes will be replaced as Alternate Bid Items. The State reserves the unqualified right to reject any and all proposals. Bids will be received for single prime bid contracts. All proposals will be lump sum. LL Everett established an additional time for Contractors and Subcontractors to meet on site to walk the building. The date is March 16th, 2023 at 10:00 am. If anyone cannot make this, please reach out to LL to set up an additional meeting time. Notice to Proceed- Monday, May 08, 2023 Number of Calendar Days – two hundred and sixty-five (265) ECU Housing has flexibility in project completion, but would like the project completed as soon as possible. Final Closeout- Sunday, January 28, 2024. The last day for requesting clarification is Wednesday, March 22, 2023 at 5:00 PM.

Details

2 Stories Above Grade, 34,547 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents