Similar Projects
Last Updated | 05/11/2021 12:10 PM |
Project Title | Downtown Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | Suffolk, VA (Suffolk City County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of drainage improvements to mitigate flooding in the downtown Suffolk area with new drainage structures and a new closed pipe system. These improvements are along Lee Street, South Street, Jackson Street, and Saratoga Street which will then be conveyed to the existing 54" storm pipe located in the median at N. Saratoga Street. The project also consists of construction of a wet pond at the southwest corner lot of the W. Washington Street and Lee Street intersection. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |