Similar Projects
City Tower Mixed Use
New Construction
Conception
$55,000,000 est. value
Grand Rapids, MI 49503

South Division Avenue Renovation
New Construction, Renovation
Conception
$11,100,000 est. value
Grand Rapids, MI 49503

Residences at Cass Lake
New Construction, Demolition - 145,559 SF
Design
$10,000,000 CJ est. value
Keego Harbor, MI 48320

Ada Drive Office Building - Renovation
Renovation, Addition, Demolition
Design
Ada, MI 49301

Bus Garage/Athletic Facilities/Tennis Courts
Post-Bid
Less than $5,000,000 est. value
Maple City, MI

Ann Arbor DDA Parking Structure Restoration 2020
Post-Bid
Ann Arbor, MI

Gannon Parking Structure Repairs 2019
Results
Lansing, MI

Parking Structure Repairs 2019
Results
Less than $3,798,500 est. value
Livonia, MI

Griffin Project - Mixed Use Development
New Construction - 117,347 SF
Construction
$65,000,000 est. value
Royal Oak, MI 48067

Sugar Hill District Apartments
New Construction - 11,000 SF
Construction
$36,600,000 est. value
Detroit, MI 48201

Grandville Avenue SW - Redevelopment Project
New Construction - 22,647 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Grand Rapids, MI 49503

Center for Health Transformation and Innovation
New Construction, Renovation, Demolition
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Grand Rapids, MI 49503

The Maple
New Construction - 173,493 SF
Design
$10,000,000 CJ est. value
Birmingham, MI 48009

Multiple Blocks - 2020 Sidewalk Program
Post-Bid
Ann Arbor, MI 48109

Parking Structure Repairs 2020
Results
Lansing, MI

Last Updated 09/15/2021 02:54 AM
Project Title

Parking Structure Maintenance

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI 49512   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For Parking Structure Maintenance including all the labor, equipment, materials, and supervision necessary and incidental to the maintenance work at Levels 1 through 4 consisting of joint sealants, traffic coating recoat, expansion joint repairs, concrete patching, concrete slab edge grinding, painting bollards and barricades, barrier strand anchor patches with elastomeric coating, terra cotta panel repairs, stair nosing grit strip replacement, stainless steel guardrail repairs, and steel galvanized coating repairs.

Details

Parking Garage, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents