Similar Projects
Heathman Hall Exterior Repair
Results
Less than $1,020,000 est. value
Kingston, RI 02881

Job Order Contracting For Vertical General Construction - Phase 2
Term Contract
Results
$50,000 to $300,000 est. value
Kingston, RI 02881

Renovations and Additions to Horace Mann Hall
Renovation, Addition, Demolition - 10,500 SF
Construction
Less than $18,000,000 est. value
Providence, RI 02908

Owner`s Program Management Services
Post-Bid
Kingston, RI 02881

Forman Center Exterior Restoration - Rhode Island College
Renovation
Results
Less than $806,483 est. value
North Providence, RI 02908

Donovan Dining Center Elevator Project
Results
Providence, RI 02908

Renovations to Chafee Auditorium
Renovation
Results
Less than $413,500 est. value
Kingston, RI 02881

Rhode Island College - Fogarty Research Laboratory, INBRE
Results
$237,400 est. value
North Providence, RI 02908

Renovations to the 2nd Floor Administration Offices CCRI Knight Campus
Renovation
Results
Warwick, RI 02886

Ranger Hall Renovations Phase 2
Renovation - 10,166 SF
Results
South Kingstown, RI 02881

Rhode Island Nurses Institute Middle College
Post-Bid
$500,000 est. value
Providence, RI 02900

Design-Bid-Build, Repair B3 Mahan Hall, Naval War College
New Construction, Renovation, Demolition - 28,480 SF
Post-Bid
Newport, RI 02841

Ryan Institute Lab Renovation
Renovation
Post-Bid
South Kingstown, RI 02881

Last Updated 03/25/2020 09:59 AM
Project Title

Student Union 3rd and 4th Floor Renovations - Rhode Island College

Physical Address View project details and contacts
City, State (County) Providence, RI 02908   (Providence County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $207,515
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Painting, carpeting, and linoleum flooring replacement throughout the majority of the 3rd and 4th floor of the Student Union. Re-caulking all Windows on the 4th floor.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents