Similar Projects
Community and Recreation Center Rooftop Unit #10 Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Pittsburgh, PA 15241

PQ List for HVAC Rehabilitation, Repairs and Renovation Services (CD)
Term Contract
Post-Bid
Pittsburgh, PA 15219

Steam Coil Repairs
Alteration
Post-Bid
Pittsburgh, PA

Center for Faculty Innovation Building Alterations - HVAC Construction
Results
Pittsburgh, PA 15212

Herron Hill Reservoir Improvements: Sodium Hypochlorite Building - HVAC Construction
Alteration
Results
$31,193 est. value
Pittsburgh, PA

Mitigation Strategies - Design and Installation
Alteration
Post-Bid
Pittsburgh, PA 15212

Alterations And Addition Hampton High School - HVAC Construction
Alteration
Results
Allison Park, PA 15101

Renovation of Existing Restrooms - HVAC Construction
Alteration
Post-Bid
Oakdale, PA 15071

Replacement of Two Existing Rooftop Air Handler Units
Alteration
Results
Oakdale, PA 15071

Propel Charter School - HVAC Upgrades
Alteration
Post-Bid
PA

TMP Terminal - HVAC
Alteration
Results
Pittsburgh, PA 15231

South Park Administration Building HVAC - General Construction
Alteration
Post-Bid
South Park Township, PA 15129

Ductwork Cleaning Authority - Wide
Alteration
Results
Pittsburgh, PA

HVAC On-Call Services
Term Contract
Post-Bid
Pittsburgh, PA

General Ancillary Services - HVAC Construction
Alteration
Results
PA

Last Updated 04/06/2023 12:04 PM
Project Title

Medical Examiner's Office TekAir Upgrades

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15222   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $985,587 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions Due Date: Mar 27th 2023, 3:00 PM EDT Questions received after this date and time may not be answered by the County. All questions must be submitted through Bonfire Project Description: This is a project to upgrade the TekAir system for the medical examiner's office. Without intending to limit or restrict the volume of work required by this Specification and the applicable drawings, the work generally consists of: 1. Verify existing control sequences of the lab systems. Verify valve airflow values, space temperatures, supply and exhaust airflow offsets. 2. Provide Method of Procedures for the demolition and new work for the various lab spaces. 3. Remove and reinstall ceiling tiles as needed to perform work above ceilings. 4. Remove existing TekAir lab controls including air valve controllers, lab controllers, fume hood controls, space thermostats, and various sensors. 5. Remove TekAir lab controls network from lab spaces back to BAS. 6. Disconnect control wiring and power wiring from existing lab control system and fume hood controls. Power and control wiring not used shall be removed. 7. Existing air valves shall remain. a. If a valve is deemed inoperable, contractor shall remove existing valve install new valve. b. Cost to remove existing valve and furnish and install new valves shall be provided as a separate bid cost from Base Bid. Provide a replacement bid price for each valve model and size. Refer to valve schedules for existing valve models and sizes. Valve models and sizes to be verified in the field. c. Refer to 15871 Laboratory Airflow Control System for valve requirements. 8. Existing damper actuators and hot water coil control valves shall remain. a. If an air valve damper actuator is not operating properly, contractor shall remove actuator and install new. b. If a hot water coil control valve and/or associated actuator is not operating properly, contractor shall remove valve and actuator and install new to match existing performance requirements. c. Cost to remove damper actuators and hot water coil control valves and furnish and install new damper actuators and hot water coil control valves shall be provided as a separate bid cost from Base Bid. Provide a typical bid price for actuator replacement or control valve replacement. Refer to 15950 Automatic Temperature Controls for actuator and control valve requirements. 9. Furnish and install new lab controls including air valve controllers, lab controllers, fume hood controls, space thermostats, and various sensors. 10. Provide equipment and wiring to provide a complete lab control system which shall be accessible at the existing workstation and remotely via a web browser. 11. Provide hardware and software including system graphics and programming to accommodate new lab controls. 12. Provide new equipment labels. 13. Provide supplemental supports for new control cabinets/enclosures. 14. Provide protection of lab equipment as directed by the Allegheny County Medical Examiner's Office representative. 15. Patch/seal holes in fire rated walls and floors to maintain proper fire rating. 16. Provide testing, balancing and adjusting. 17. Provide access doors in ceiling system where required. 18. Provide fire sealing at all openings around pipe and conduit penetrations through fire rated walls and floors. 19. Provide operating and maintenance instructions and manuals. 20. Provide demonstration of successful operation of the lab systems and fume hood controls. 21. Provide training for systems operations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents