Similar Projects
Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Kroger #721
Renovation, Addition - 29,950 SF
Design
Pinckney, MI 48169

Kroger #661 / Farmington Hills
Renovation - 46,295 SF
Bidding
$1,000,000 est. value
Farmington Hills, MI 48336

Sam's Club #6664-221 - GS
Renovation
Post-Bid
$1,250,000 est. value
Utica, MI 48315

Kroger #366-07: Interior Remodel
Renovation - 45,000 SF
Post-Bid
South Lyon, MI 48178

SAR; Frmr Wesson Filling Station - Remedial Invest
Renovation
Results
Detroit, MI

DPS Vactor Pad and Washbay Project
Renovation
Results
Rochester Hills, MI

Kroger #649-04
Renovation
Construction
$1,200,000 est. value
Lake Orion, MI 48359

New North Flint Food Market
Renovation
Construction
$1,753,600 est. value
Flint, MI 48504

Gas Station Redevelopment (Circle A)
New Construction, Demolition - 3,612 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Sterling Heights, MI 48310

Gas Station Redevelopment (Circle A)
New Construction, Demolition - 3,612 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Sterling Heights, MI 48310

AGO Gas Station & Convenience Store
New Construction - 4,860 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Walker, MI 49534

Kroger #419-05
Renovation - 45,000 SF
Post-Bid
Flushing, MI 48433

Zippy Auto Wash
New Construction - 4,843 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Ypsilanti, MI 48197

Nye's Apple Barn and Farms - Redevelopment
New Construction - 17,200 SF
Pending Verification
Saint Joseph, MI 49085

Reported 07/08/2022 09:32 AM
Project Title

Meijer / Inverness Township (Cheboygan)

Physical Address View project details and contacts
City, State (County) Cheboygan, MI 49721   (Cheboygan County)
Category(s) Commercial
Sub-Category(s) Car Wash, Gas Station, Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected July 2025
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 7, 2022, the project is in planning. No development applications or building permits have been submitted into the City of Cheboygan. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however, construction is not expected to begin prior to 2025 at the earliest. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.Mixed Use.

Details

Car Wash, New Construction, Gas Station, New Construction, Supermarket/Convenience Store, New Construction, 195,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents