Similar Projects
Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Bridge Preservation Projects at Canyon De Chelly National Monument (Cach 304900
Post-Bid
$1,000,000 to $5,000,000 est. value
Chinle, AZ

T2 RBDC Bridge
New Construction
Post-Bid
Glendale, AZ 85355

Baker Canyon Low-Water Crossing
Results
Safford, AZ

Rio Salado Shared Use Path - Mcclintock Drive Bridge Underpass
Results
$931,949 est. value
Tempe, AZ

Reconstruction of Court House Pedestrian Bridge
Post-Bid
Bisbee, AZ

Flagstaff-Hollbrook Highway Little Colorado River Bridge
Results
$1,500,000 est. value
Phoenix, AZ

Broadway Road Bridges at Tempe Canal
Post-Bid
$6,000,000 est. value
Phoenix, AZ 85003

Bridge Deck Rehabilitation
Results
Less than $3,600,000 est. value
AZ

CBP Tucson Sector Tactical Infrastructure Maintenance and Repair (CTIMR)
Renovation
Post-Bid
$750,000 est. value
Tucson, AZ

Bridge Deck Replacement
Results
Less than $1,900,000 est. value
Tuba City, AZ

Bridge Rehabilitation
Results
Less than $5,800,000 est. value
AZ

Bridge Deck Replacements
Results
Less than $5,800,000 est. value
AZ

Bridge Replacement
Results
Less than $98,000,000 est. value
AZ

Last Updated 01/03/2020 04:20 AM
Project Title

System Preservation (Engineering)

Physical Address View project details and contacts
City, State (County) Flagstaff, AZ 86001   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of widening and replacing the existing bridges at the 4th Street Underpass (UP) using the slide method of construction and rehabilitation of the existing bridge decks at the Butler Avenue Overpass (OP). Additional work at 4th Street includes construction of the widened roadway approaches to the bridges and the installation and removal of detour crossovers to maintain traffic on I-40 during construction. Additional work at Butler Avenue OP includes replacement of guardrail on I-40 and repairs to the existing sloped pavement and concrete barrier.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents