Similar Projects
Replacement of Kitchen Grease Interceptor - Juvenile Medium Security Facility (JMSF) North, JJC Johnstone Campus
Alteration
Bidding
$168,940 est. value
Fieldsboro, NJ 08505

Interior Alterations at the Service Building
Alteration
Bidding
Waldwick, NJ 07463

Hallway Renovation
Post-Bid
Cliffside Park, NJ 07010

Teaneck Public Schools Energy Savings Plan
Post-Bid
Teaneck, NJ 07666

Schwartz-Robeson Complex Plumbing Repairs and Maintenance
Results
Less than $200,000 est. value
New Brunswick, NJ 08901

On-Site Inspection and Plan Review Agencies for Electrical, Plumbing
Term Contract
Results
Egg Harbor Township, NJ 08234

108 South 9th Street Summer 2021 Capital Projects
Renovation
Construction
$22,000 est. value
Newark, NJ 07107

108 South 9th Street Summer 2021 Capital Projects
Renovation
Construction
$22,000 est. value
Newark, NJ 07107

Entire Flue Interior Resurfacing
Alteration
Bidding
Newark, NJ 07102

Dumont Police Department Ceiling
Post-Bid
Dumont, NJ 07628

Clementon Elementary School - Plumbing Contract
Results
$90,900 est. value
Clementon, NJ

Plumbing Services
Term Contract
Bidding
Newark, NJ

Plumbing Services
Post-Bid
Califon, NJ 07833

Plumbing Repairs and Small Projects
Results
$115 est. value
Millville, NJ 08332

Plumbing, Maintenance, Installation and Repair
Term Contract
Bidding
Newark, NJ

Reported 02/02/2022 09:36 AM
Project Title

Kitchen, Bathroom and Plumbing Improvements

Physical Address View project details and contacts
City, State (County) Bayonne, NJ 07002   (Hudson County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, Plumbing
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Supply and install all required piping, valves, cleanouts, terminations, fittings, anchoring devices, firestop material, and all else necessary for a complete scope of work, whether noted or inferred. 10. Air test all new piping and certify the installation to the Bayonne Housing Authority. 11. Replacement of finishes, fixtures and accessories for existing bathrooms and kitchens including, but not limited to: • H.U.D. approved millwork • Bathtubs and enclosures • Water closets • Bath lavatories • Kitchen sinks • Flooring • Painting • Light fixtures

Details

Division 06 - Wood, Plastics, and Composites, Millwork.
Division 09 - Finishes, Flooring, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing, Residential Plumbing Fixtures, Residential Water Closets, Urinals, and Bidets, Residential Bathtubs.
Division 26 - Electrical, Interior Lighting, Interior Lighting Fixtures, Lamps, And Ballasts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents