Similar Projects
Amp 1 Water Heater Replacement
Alteration
Bidding
Springfield, IL

Chiller Maintenance and Repair State Museum
Term Contract
Post-Bid
Springfield, IL 62706

Insulation Repair Services for Plumbing and Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL

Emerson Building HVAC Replacement Phase I
Renovation
Results
$1,000,000 to $1,500,000 est. value
Springfield, IL 62794

Howlett HVAC Maintenance
Results
Springfield, IL 62701

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Replace HVAC - Emmerson Building
Results
Less than $1,500,000 est. value
Springfield, IL 62794

Emergency Final Costs - Vandalia Statehouse Chiller Replacement
Post-Bid
Springfield, IL

Upgrade HVAC System
Renovation
Results
Less than $2,000,000 est. value
Springfield, IL 62703

HVAC and Mechanical Products
Term Contract
Post-Bid

Renovate Building 2 For Soldier Support - Ventilation
Renovation
Results
Less than $100,000 est. value
Springfield, IL 62702

DAT-Academy-HVAC Repair & Maintenance Services
Term Contract
Post-Bid
Pawnee, Springfield, IL 62712

HVAC Upgrades - Herndon Building
Renovation
Results
Springfield, IL 62756

Unit 4 Cooling Tower Fan Replacement
Post-Bid
Springfield, IL

Update HVAC Controls - Heating
Results
Less than $1,400,000 est. value
Springfield, IL 62702

Reported 06/04/2021 12:00 AM
Project Title

HVAC Equipment Replacement

Physical Address View project details and contacts
City, State (County) Pawnee, IL 62558   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of five (5) HVAC units. • Disconnect and remove existing HVAC systems including refrigerant recovery. • Provide and install high efficiency furnaces and cased coils. o Efficiency must be a Minimum of 90% • Provide and install all venting (including concentric kits and roof or wall flashings), drains and gas piping for each new furnace. • Install new condensers on new composite pads and re-route refrigerant lines overhead. o SEER must be a Minimum of 13 • Provide and install necessary duct transitions and new non-programmable thermostats. • Each unit must be supplied with a Filter and Filter Rack • Inspect all existing duct under the Main Building concrete slab and provide photos for owner job files. • Provide start-up and commissioning information on all equipment

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents