Similar Projects
Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

Civil Structural Construction Work Order 2021-2022
New Construction
Post-Bid
$3,000,000 est. value
Seattle, WA

West Point Treatment Plant Capital Program Construction Work Order
New Construction
Post-Bid
$15,000,000 est. value
Seattle, WA

CM Services for the WPTP Raw Sewage Pump Replacement Project
New Construction
Post-Bid
$300,000 est. value
WA

NE Spring Boulevard - 130th Ave NE to 132nd Ave NE
Renovation, Alteration
Results
$6,000,000 to $6,500,000 est. value
Bellevue, WA 98007

Marymoor Stormwater Facility
New Construction
Conception
$900,000 est. value
WA

Lake Hills Interceptor Corrosion Rehabilitation
Renovation
Design
$19,000,000 est. value
WA

South Plant Dewatering and Truck Loading Bay Ventilation Improvements
Renovation
Design
$1,300,000 est. value
WA

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

West Point Treatment Plant Primary Sedimentation Tank Coating
Renovation
Design
$3,700,000 est. value
WA

MBR Equipment for Train 4
Renovation
Results
Duvall, WA 98019

2022 Lakota Primary Clarifiers and Scum System Improvements
Renovation
Results
$1,600,000 to $2,000,000 est. value
Federal Way, WA 98023

South Wellfield Improvement Project - City Of Snoqualmie
Renovation, Infrastructure
Conception
$1,745,011 CJ est. value
Snoqualmie, WA 98065

Eagle Lake Water Reclamation Basin Improvement Project - City of Snoqualmie
New Construction, Infrastructure
Conception
$2,034,151 CJ est. value
Snoqualmie, WA 98065

RFP - Program Management and Owner Advisory Services for Mouth of Duwanish Program
Term Contract
Bidding
Seattle, WA 98164

Last Updated 11/07/2022 05:02 PM
Project Title

RFQ Engineering - Water Reclamation Facility Improvements - Phase 3

Physical Address View project details and contacts
City, State (County) Snoqualmie, WA 98065   (King County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 7, 2022, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made. Closed solicitation has been included below for reference. ……………….. City of Snoqualmie Water Reclamation Facility Improvements - Phase 3 The City of Snoqualmie (City) is soliciting Request for Qualifications (RFQ) from consulting firms with expertise in design and construction of wastewater facility projects. This request is for engineering consulting services for preliminary design of Phase 3 improvements to the City Water Reclamation Facility (WRF). The City requires assistance with project planning; permitting; preparation of plans, specifications, cost estimates, and reports; and related professional services extending through preliminary engineering, reporting, and agency approval. Project Description: The City WRF is designed to treat up to 2.15 million gallons per day (MGD) of wastewater and seasonally produce up to 1.56 MGD Class A Reclaimed Water. Improvements are needed to the City WRF to address projected deficiencies related to the existing WRF oxidation ditches, secondary clarifiers, and reclaimed water filters. These improvements have been identified in the draft General Sewer Plan and incorporated into the most current Capital improvement Plan (CIP). Please note that the Snoqualmie City Hall has limited hours due to the ongoing COVID pandemic. If submittal packages will be hand delivered, please call in advance and arrange for delivery. The method of contractor selection has not been determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents