Similar Projects
New Fire Station - Tri-Lakes Monument Fire Protection District
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Monument, CO 80132

Hancock and Delta Mixed-Use Development
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Colorado Springs, CO 80910

Corvallis
New Construction, Infrastructure
Design
$480,000,000 CJ est. value
Fountain, CO 80925

Fields Park Bathroom Renovation and Expansion
Addition, New Construction, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Manitou Springs, CO 80829

Super Star Car Wash - Colorado Springs- Razorback and Voyager
New Construction, Infrastructure - 6,576 SF
Bidding
$1,000,000 CJ est. value
Colorado Springs, CO 80920

National Chain Car Dealership / Colorado Springs
New Construction, Infrastructure - 6,827 SF
Post-Bid
$1,000,000 CJ est. value
Colorado Springs, CO 80922

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Construction of the Booster Pump House
New Construction
Results
Peyton, CO

Point of the Pines and Green Mountain Falls Booster Pump Stations CM/GC Services
New Construction
Results
Colorado Springs, CO 80907

Hampton Inn
New Construction
Construction
$2,000,000 est. value
Colorado Springs, CO 80900

Falcon Commerce Center
New Construction
Construction
$190,000 est. value
Monument, CO 80921

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Pike Solar Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Colorado Springs, CO 80903

Wahsatch & Rio Grande Apartments
New Construction, Infrastructure
Design
$78,000,000 CJ est. value
Colorado Springs, CO 80903

Paseo Road Box Culvert
Infrastructure
Bidding
$1,000,000 CJ est. value
Colorado Springs, CO 80909

Last Updated 09/06/2022 03:31 PM
Project Title

Rolling Hills Booster Pump Station

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $2,719,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 6, 2022. This project has not yet been awarded. A timeline for award has not yet been established. Question Acceptance Deadline 04/20/2022 04:00 PM EDT Questions are submitted online No A description of the work to be performed generally includes construction of a ~1710 sq ft CMU block building with concrete foundation, chlorine dosing system, potable water booster pump system and bathroom. The pumping system includes (4) four 100 HP pumps, associated piping, controls, electrical panels and wiring, backup generator, pressure relief system, valves, meter and instrumentation. Site work includes 16"/18" diameter field piping, building penetrations, sanitary sewer service and potable water connections, fencing, grading and erosion control, landscaping, and all incidental work required to complete the project as specified in the drawings and specifications. Bonding Requirements - Bid Bond 5 % Project No. CS18779-125 L1, 21125

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents