Similar Projects
Mill, AC Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration
Infrastructure
Conception
$5,356,000 CJ est. value
Custer, SD 57730

Mill, AC Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration
Infrastructure
Conception
$5,356,000 CJ est. value
Custer, SD 57730

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,852,000 CJ est. value
Custer, SD 57730

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,852,000 CJ est. value
Custer, SD 57730

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

North 7th Street Water and Sanitary Sewer Extension
Infrastructure
Results
Custer, SD 57730

Structure Demolition and Site Restoration
Demolition, Infrastructure
Results
Custer, SD 57730

Urban Grading, Curb and Gutter, Storm Sewer, Lighting, PCC Surfacing, Sidewalk, Curb Ramps - US 16
Infrastructure
Conception
$21,362,000 CJ est. value
Custer, SD 57730

Intersection Improvements
Infrastructure
Post-Bid
SD

Shared Use Path
Infrastructure
Results
SD

Bismark Lake Boardwalk Removal and Install - Black Hills National Forest
Infrastructure
Post-Bid
$25,000 to $150,000 est. value
Custer, SD

Chip Seal Treatment of Custer Football/Track Complex
Infrastructure
Results
Custer, SD 57730

Sylvan Lake Store Replacement
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Custer, SD 57730

Asphalt Surface Treatment
Infrastructure
Results
Custer, SD

Last Updated 06/02/2023 02:33 AM
Project Title

Phase I Watermain System Improvements

Physical Address View project details and contacts
City, State (County) Buffalo Gap, SD 57722   (Custer County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Capitol/Court House/City Hall, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,423,866 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The project consists of the installation of new watermain piping, valves, curbstops, water service piping and fire hydrants. Work also consists of asphalt street repair, concrete curb and gutter, gravel street repair, sidewalk repair, storm sewer repair along with other miscellaneous work. Bids are requested for the following Contract: Base Bid and Alternate Bid. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Bidders on this work will be required to comply with the Presidents Executive Order Nos. 11246 as amended, 11518, and 11625 as amended. The requirements for bidders and contractors under these orders are explained in the specifications. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. The low responsive bidder must assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. This project may be partially funded using American Rescue Plan Act (ARPA) funds. As a condition of the ARPA funding guidelines, the Contractor is shall meet the following minimum requirements: Based on the "Build America, Buy America" provisions of the Infrastructure Investment and Jobs Act (IIJA) and E.O. 14005 which provide that, as appropriate and to the extent consistent with law, a preference will be provided to Contractors for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products.) The Contractor shall provide documentation of their efforts to meet the provisions of "Build America, Buy America" upon request. Please be advised that waivers or exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women's Business Enterprises (WBE) are explained in the specifications. The goals for DBE/MBE participation are 1% and WBE participation are 4%. Bidders are also reminded that not less than the minimum wages as determined by the Davis Bacon Act and set forth in the Contract Documents must be paid on this project and that the contractor and/or subcontractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. In addition to all of the above listed Federal requirements for work on this project, compliance with the contract Work Hours and Safety Standards Act, Executive Order 11375, Copeland Act, the Clean Air Act, and Water Pollution Control Act, and subsequent amendments to all of the above will be required of contractors and/or subcontractors performing work on this project.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents