Similar Projects
Fourth Avenue Mixed-use Building
Demolition, New Construction, Infrastructure - 6,312 SF
Design
$2,000,000 CJ est. value
Brooklyn, NY 11217

Bay Parkway Residential Development
Demolition, New Construction, Infrastructure - 47,525 SF
Design
$10,000,000 CJ est. value
Brooklyn, NY 11214

RFEI for Wycoff Gardens Community Center
Addition - 1,700 SF
Post-Bid
Brooklyn, NY 11217

Design and Construction Services for Barrier Replacements
Demolition, Infrastructure, Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
Brooklyn, NY 11201

BQE Structural Minor Rehabilitation (When & Where)
Renovation, Term Contract
Results
$40,000,000 est. value
Brooklyn, NY 11201

Milling Existing Asphaltic Concrete Wearing Course in Preparation of Resurfacing
Infrastructure
Results
Bronx, Brooklyn, Manhattan, New York, Staten Island, NY

Fulton Street Mixed Use
New Construction, Infrastructure - 130,000 SF
Construction
$50,000,000 CJ est. value
New York, NY 11238

Fulton Street Mixed Use
New Construction, Infrastructure - 130,000 SF
Construction
$50,000,000 CJ est. value
New York, NY 11238

Rutland Road Mixed Use
Demolition, New Construction, Infrastructure - 338,611 SF
Pending Verification
$103,000,000 CJ est. value
New York, NY 11203

Rutland Road Mixed Use
Demolition, New Construction, Infrastructure - 338,611 SF
Pending Verification
$103,000,000 CJ est. value
New York, NY 11203

57th Street Apartments
Demolition, New Construction, Infrastructure - 7,938 SF
Design
$2,600,000 CJ est. value
New York, NY 11220

Community Center Addition
Addition
Post-Bid
Brooklyn, NY 11238

Crack and Joint Sealing on Asphalt Pavements; Regionwide
Infrastructure
Results
$1,300,000 est. value

Repairs and Painting on the Gowanus Viaduct in Brooklyn
Infrastructure
Construction
$167,358,000 CJ est. value
New York, NY 11220

Pennsylvania Avenue Affordable Housing Building / Brooklyn
New Construction, Infrastructure - 16,891 SF
Pending Verification
$10,000,000 CJ est. value
New York, NY 11207

Last Updated 01/09/2023 03:44 PM
Project Title

39th Street Community Facility

Physical Address View project details and contacts
City, State (County) Brooklyn, NY 11218   (Kings County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 9, 2023, the plan exam was disapproved by the New York City Building Department on March 26, 2020. Information regarding a general contractor has not been disclosed. A timeline for construction is not available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

7 Stories Above Grade, 17,183 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents