Similar Projects
Allegro of Noblesville
New Construction, Infrastructure
Conception
$83,000,000 est. value
Noblesville, IN 46060

Other Intersection Improvement
Alteration
Conception
$585,000 est. value
Goshen, IN 46528

HMA Overlay Minor Structural
Infrastructure
Design
$520,000 est. value
Portage, IN

Bridge Deck Overlay - SR 54
Renovation, Infrastructure
Design
$500,000 est. value
Bloomfield, IN 47424

Asphalt Resurface
Infrastructure
Bidding
$300,000 est. value
Martinsville, IN

Johnny Appleseed Campground Improvements
Infrastructure
Bidding
$550,000 est. value
Fort Wayne, IN 46805

2021-01 Road Paving - Eaton-Wheeling
Post-Bid
Muncie, IN 47302

Mill and Resurface
Post-Bid
McCordsville, IN 46055

2021 Street Paving Program
Results
Less than $305,000 est. value
Culver, IN

Dunton Road Improvements
Results
Less than $1,000,000 est. value
Fort Wayne, IN

Duke Energy Substation Access Road Project
Infrastructure
Bidding
$640,000 est. value
Jeffersonville, IN

Street Resurfacing
Post-Bid
Cynthiana, IN

New Palestine High School Traffic Improvements
Results
New Palestine, IN 46163

South Main Street Resurfacing and Storm Sewer Replacement
Infrastructure
Bidding
$400,000 est. value
Versailles, IN 47042

2020-2 CCMG Paving
Post-Bid
Farmersburg, IN

Reported 07/13/2022 12:00 AM
Project Title

Roadway Projects

Physical Address View project details and contacts
City, State (County) English, IN   (Crawford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $123,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The detailed proposal for each selected roadway is as follows: 1) East North Ridge Road starting at SR 66 west on North Ridge with a length of .70 mile. Mobilization, mill, prep, clean and application of HMA type B, 2 inch intermediate to include traffic control, 2) Alton Fredonia Road starting at South Cape Sandy Road and going north approx. 3,200 feet on Alton Fredonia Road with a length of .60 miles. Mobilization, mill, prep, clean and application of HMA Type B, 2 inch intermediate to include traffic control, 3) South Schooner Point Road from South Cape Sandy Road to East Ralph Lane with a length of .46 miles. Mobilization, mill, prep, clean and application of HMA type B, 2 inch intermediate to include traffic control and 4) South Cape Sandy Road from Alton Fredonia Road to Archibald Falls Road with a length of 1.04 mile. Mobilization, mill, prep, clean, HMA patching, type B 2 inch intermediate to include traffic control. Compacted 53 shoulder stone shall be placed along both sides of new paved roadways. Shoulder stone to be 18 inches wide where applicable. AII adjacent roads, driveways and mailboxes shall have an asphalt apron of 18 inches minimum width.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents