Similar Projects
Tidal Wave Auto Spa Car Wash / Salina
New Construction, Infrastructure - 10,766 SF
Design
$2,500,000 CJ est. value
Salina, KS 67401

Oakdale Senior Village Oakdale and Johnstown
New Construction, Infrastructure
Design
$750,000 CJ est. value
Salina, KS 67401

HMA Pavement, Crack Repair, Profile Milling, and Aggregate Shoulder Construction
Infrastructure
Bidding
$900,000 CJ est. value
Salina, KS 67401

2023 Major Concrete
Infrastructure
Bidding
$60,000 CJ est. value
Salina, KS 67401

2023 Chip Seal
Infrastructure
Post-Bid
$300,000 CJ est. value
Salina, KS 67401

Smoky Hill River Greenway Trail Phase 1
Infrastructure
Post-Bid
$900,000 CJ est. value
Salina, KS 67401

Donmyer and Water Well Road Improvements
Infrastructure
Results
$894,579 CJ est. value
Eureka, KS 67448

Donmyer and Water Well Road Improvements
Infrastructure
Results
$894,579 CJ est. value
Eureka, KS 67448

Delano Multimodal Center and Park-N-Ride - City of Wichita
New Construction, Infrastructure
Pending Verification
$19,600,000 CJ est. value
Salina, KS 67401

Kenwood Park Improvements - Saline County
Renovation, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Salina, KS 67401

2023 Road Improvement Projects
Infrastructure
Results
$285,628 CJ est. value
Salina, KS 67401

Belmont Boulevard from S. Ninth Street to Highland Avenue - City of Salina
Infrastructure
Pending Verification
$250,000 CJ est. value
Salina, KS 67401

Centennial Road Improvements, Water Well Road to the South City Limits
Infrastructure
Results
$2,188,389 CJ est. value
Salina, KS 67401

Broadway Boulevard from W. Ash Street to N. Chicago Street - City of Salina
Infrastructure
Pending Verification
$350,000 CJ est. value
Salina, KS 67401

2023 Mill and Inlay
Infrastructure
Results
$1,016,049 CJ est. value
Salina, KS 67401

Last Updated 03/14/2023 12:34 PM
Project Title

Interconnect with Saline RWD #3

Physical Address View project details and contacts
City, State (County) Salina, KS 67401   (Saline County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all labor, equipment and materials, and performing all work necessary for construction and installation of the following: one booster pump station; construction and installation of approximately 670 linear feet of 3-inch through 4-inch PVC water line; miscellaneous appurtenances; remove and replace surfacing; fencing; seeding; and all other work and appurtenances necessary to complete the construction items as shown on the plans and specified herein. Direct all questions to Chad Lawson at clawson@hwlochner.com

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents